Laserfiche WebLink
l & O& 43 0 Photovoltaic Facility <br /> <br />"Photovoltaic.facili.ty" means one or more electrical power generators that <br />convert sunlight into electricity through the utilization of semiconductor <br />cells. <br /> <br />18.08.435 Portable, Temporal. Electricity Generator, Fuel Cell, or Battery <br /> Facility <br /> <br />"Portable, temporary electricity generator,.fuel cell, or battery.facility" <br />means one or more electrical power generators (not including nuclear power <br />generators),.fuel cells, and/or batteries on a site which produce electricity via <br />an engine, turbine, fuel cell, or battery, and which are portable, less than <br />l OKW in combined total size, and which are used only on a temporary and <br />intermittent basis. <br /> <br />18.08.605 Wind Energy Facility <br /> <br />"Wind energy facili.tv" means one or more electrical power generators that <br />convert wind into electricity through the utilization ora shaft turned by <br />blades or similar structure, which are turned by wind <br /> <br />{Renumber Chapter 18.08 as necessary} <br /> <br />2. Chapter 18.20 (Design Review) <br /> <br />18.20.010 Projects Subject To Design Review: <br /> <br />In order to preserve and enhance the City's aesthetic values and to ensure the <br />preservation of the public health, safety, and general welfare, the following <br />projects shall be subject to discretionary design review. <br /> <br />A. The Planning Commission is empowered to review and make decisions <br /> concerning the following classes of projects: <br /> <br />1. All outdoor uses, new improvements and structures, or expansions <br /> thereof, proposed within all zoning districts except the PUD District. <br />2. Any matter referred to it by the Zoning Administrator for decision. <br />3. Appeals of items acted upon by the Zoning Administrator. <br /> <br /> Page 4 <br />Draft Ordinance for Case PRZ- 7 <br /> <br /> <br />