Laserfiche WebLink
Ri 76-90% <br /> 24f.Office buildings <br /> IL 76-90% <br /> 24g. Shops <br /> IL 76-90% <br /> 24h. Public Housing <br /> 2 31-45% <br /> *25. Does your community have transit service? <br /> IL Yes <br /> ▪ No <br /> *25a.Are buses equipped with bike racks? <br /> 2 Yes <br /> El No <br /> 25b.What percentage? <br /> • 91-100% <br /> 25c. Are bikes allowed inside transit vehicles? <br /> Li Yes <br /> IL Sometimes <br /> El No <br /> If yes eti ,describe <br /> Bikes or are som allowmesed in all low floor buses(90%of the fleet)if there is room in the vehicle,there are no wheelchair passengers,and <br /> the passenger can control the bicycle.Bay Area Rapid Transit(BART)allows bicycles during non peak hours. <br /> *26. What is the mileage of your total road network? <br /> 206 <br /> *27. What is the mileage of your total shared-use path network? <br /> 6 <br /> 28. List your current and planned bicycle accomrrodations? <br /> a.B lap <br /> Current ike Mies s <br /> 29 <br /> Planned Miles <br /> 23 <br /> b.Shared lane markings <br /> Current Miles <br /> 0 <br /> Planned Miles <br /> 6 <br /> c. Bike levards <br /> Current Mlles <br /> 0 <br /> Planned Miles <br /> 0 <br /> d.Signed bike routes <br /> Current Miles <br /> 10 <br /> Planned Miles <br /> 8 <br /> e. Paved shared use paths <br /> Current Miles <br /> 6 <br /> Planned Miles <br /> 18 <br /> f.Natural surface shared use paths <br /> Current Miles <br /> 7 <br /> Planned Miles <br /> 2 <br /> Cg.Sino et k <br /> urren Mies c <br /> 1 <br /> Planned Miles <br /> 1 <br /> *29. What other innovative ways have you imprcved on-road conditions for bicyclists? <br /> Road diets <br /> ▪ Area wide traffic calming <br />