Laserfiche WebLink
El Design <br /> El Manual <br /> El Training <br /> El Other <br /> If other,describe <br /> 20. How do you ensure your engineers and planners accommodate cyclists according to AASHTO and MUTCD standards? <br /> IL Training <br /> El Offer fHWA/NHI Training Course, <br /> D Hire Outside consultants to train staff <br /> ILJ Send staff to bicycle-specific confgrences/training <br /> El Require project consultants to have bike/ped qualifications <br /> IL Internal training or design manual <br /> 20a. Describe each checked <br /> Staff attend training classes offered through UC Berkeley Technology Transfer Program to keep current with latest changes to the <br /> MUTCD and AASHTO manuals.Staff also attend webinars offered through the Pedestrian and Bicyle Information Center and the <br /> Association of Pedestrian and Bicycle Professional.Staff are provided with up to date MUTCD and AASHTO manuals. <br /> *21. What percentage of bridges and tunnels in your community are accessible to bicyclists? <br /> 30 <br /> 21a. What are the exceptions? <br /> Pleasanton has an extensive network of creeks and canals.30 percent of the roadway bridges spanning over these waterways have <br /> bike lanes,and on the remainder of the bridges bicycles must share the lane with vehicular traffic. <br /> *22. How do you ensure there are end-of-trip facilities for bicyclists? <br /> • Bike parking ordinance <br /> El Bike parking ordinance for all new developments <br /> ljOrdinance requiring showers and lockers <br /> ElB• uilding accessibility ordinance <br /> flOn street bike parking <br /> O• rdinance that allows bike parkingls substitute for car parking. <br /> IL Standards for bicycle parking that conform to APBP guidelines <br /> IL O• ther <br /> If other,describe <br /> New projects must conform to Section 5.11)6.4 of the 2010 California Green Building Standards Code which requires bicycle parking <br /> equivalent to 5%of motor vehicle parking spaces provided.In addition,the City of Pleasanton Standard Conditions of Approval for <br /> new projects contains specifications for bicycle parking. <br /> 23. How many bike parking spaces are there in your community? <br /> 23a. Bike racks <br /> 960 <br /> 23b.Bike lockers <br /> 66 <br /> 23c. Bike depot(i.e. Bikestation) <br /> 0 <br /> 23d.In-street bike parking <br /> 0 <br /> 24.Approximately what percentage of these locations have bike racks or storage units? <br /> 24a. Schools <br /> IL 91-100% <br /> 24b. Libraries <br /> • 91-100% <br /> 24c. Transit Stations <br /> 91-100% <br /> 24d.Parks&Recreation Centers <br /> IL 9• 1-100% <br /> 24e. Government buildings <br />