construction dust to the extent feasible, as determined by the City Engineer. <br /> These measures shall be incorporated into the construction documents <br /> describing procedures and specifications for contractors to follow: <br /> • Water all active construction areas at least twice daily. <br /> • Cover all trucks hauling soil, sand, and other loose materials to or <br /> from the Project Area or require all trucks to maintain at least two <br /> feet of freeboard. <br /> • Pave, apply water three times daily, or apply (non-toxic) soil <br /> stabilizers on all unpaved access roads, parking areas and staging <br /> areas at construction sites. <br /> • Sweep daily (with water sweepers) all paved access roads, parking <br /> areas and staging areas at construction sites. <br /> • Sweep streets daily (with water sweepers) if visible soil material is <br /> carried onto adjacent public streets. <br /> • Hydroseed or apply (non-toxic) soil stabilizers to inactive <br /> construction areas (previously graded areas inactive for ten days or <br /> more). <br /> • Enclose, cover, water twice daily or apply (non-toxic) soil binders to <br /> exposed stockpiles (dirt, sand, etc.). <br /> • Limit traffic speeds on unpaved roads to 15 mph. <br /> • Install sandbags or other erosion control measures to prevent silt <br /> runoff to public roadways. <br /> • Replant vegetation in disturbed areas as quickly as possible. <br /> • Suspend excavation and grading activities to the extent feasible <br /> when instantaneous wind gusts exceed 25 mph. <br /> • Limit, to the extent feasible, the number of areas adjacent to <br /> residences subject to excavation, grading and other construction <br /> activity at any one time. <br /> 9. Underground Service Alert. Prior to initiation of any on-site construction <br /> activities, the project developer shall contact the Underground Service Alert <br /> (USA) whose purpose is to receive planned excavation reports from public <br /> and private excavators and to transmit those planned excavation reports to <br /> all participating members of USA who may have underground facilities at <br /> the location of excavation. The USA will contact local utilities and inform <br /> them that construction is about to begin in their service area. This notice <br /> allows local utilities to mark the areas where their underground facilities are <br /> located near the construction site so that they may be avoided during <br /> project construction. <br /> 10. PG&E Gas Line. Prior to construction activities within 50 feet of the PG&E <br /> gas line, the project contractor shall identify and demarcate the location of <br /> the natural gas pipeline using highly visible markers that will remain in place <br /> throughout project construction in the vicinity of the pipeline and ensure that <br /> all construction workers are aware of the location of the line. The location of <br /> Conditions of Approval/PUD-68 <br /> Appendix Conditions 11 <br />