Laserfiche WebLink
Fee Comparison Chart <br /> Pleasanton Pleasanton Livermore_ Dublin San Ramon Fremont WalnutCreek "Fee <br /> in process of <br /> (current) (proposed)*** updating fees average <br /> Plannin• Services <br /> TM TM TM <br /> Initial Deposit' Initial Deposir Initial Deposit <br /> Conditional Use Permit $150 $3,000 $10,590 $1,000 $3900 $2,400 $1,000 $3,498 <br /> TM TM TM <br /> TM Initial Deposit' Initial Deposit* Initial Deposit <br /> Site Plan Approval(Staff Level) $50 $820 $3,880 $5,000 $1,700 $850 $2,450 <br /> TM TM TM <br /> TM Initial Deposit' Initial Deposit' Initial Deposit <br /> Desitn Review $50 $2,650 $510 $300 $1,700 $850 $2,650 <br /> TM TM TM TM <br /> Initial Deposit Initial Deposit` Initial Deposit' Initial Deposit <br /> Negative Declaration $25 $2,100 $4.270 $25,000 $1,500 $750 $570 $7,947 <br /> TM TM TM TM <br /> $,2,000 $15,219 Initial Deposit Initial Deposit' Initial Deposit' Initial Deposit <br /> Tentative Tract Map +$104ot $4,640 +$754ot $10,000 $3,000 $4,800 $5,400 $42,419 <br /> Range from TM TM TM <br /> $3,000 to Initial Deposit Initial Deposit' Initial Deposit <br /> Planned Unit Development $2000 $20,000 $14,960 $5,000 $4,000 $3,400 $6,072 <br /> TM=Time and Material Cost Recovery <br /> 'Initial Deposit generally does not cover total cost. Additional deposits required depending on level of service complexity. <br /> "Average compiled does not included cities that charge exclusively based on Time 8 Materials <br /> ***Subject to annual increase in the ENR CC I_ <br /> Fee Comparison Chart <br /> Pleasanton Pleasanton Livermore Dublin San Ramon Fremont Walnut Creek "Fee <br /> in process of <br /> (current) (proposer""" updating fees average <br /> updated updated <br /> En•ineerin• Services 1990) 1984) <br /> $120/hr <br /> $500 Deposit <br /> $25 $30 $90 $10 $70 $90 Sidewalk; $58 <br /> $90 insp $90 insp $220 insp $80/hr insp $80/hr insp $132/hr insp $1,500 Deposit $134/hr <br /> Encroachment Permit (min) (mm) (min) (min) ($160 min) (min) Trenching insp <br /> TM (typical) <br /> TM $7,000 <br /> $7,500 $7,000 $12,500 Deposit $1,500-$2,500 <br /> $600+ $4,500+ deposit+ (typical) (typical) $4,000- Deposit+ <br /> Final Map Check` 50/lot 30/lot TM TM TM $11,500 $130/hr $7,083 <br /> $60,000'" 351400 TM $60,000 <br /> (typical) (typical) Included in (typical) <br /> Improvement Plan Check' $20,000 $20,000 $61,750 TM TM Map Fee TM $50,630 <br /> $64,250 <br /> Encroachment&Construction (typical) <br /> Inspection Fee' $40,000 $40,000 $77,250 TM TM $30,000 $80,000 $58,300 <br /> TM=Time and Material Cost Recovery <br /> 'Based on a project with$1 million in public improvements <br /> "Average compiled does not included cities that charge exclusively based on Time 8,Materials <br /> "'Based on project with$400k in public improvements <br /> """Subject to annual increase in the ENR CCI <br /> Min =Minimum <br /> Page 6 of 8 <br />