My WebLink
|
Help
|
About
|
Sign Out
23
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
041911
>
23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2011 1:11:11 PM
Creation date
4/13/2011 12:39:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/19/2011
DESTRUCT DATE
15Y
DOCUMENT NO
23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br /> THE CITY OF <br /> PLEAS4NTON. <br /> December 2, 2009 <br /> Mr. Dan Leavitt, Deputy Director <br /> Attn: Altamont Corridor Rail Project EIR/EIS <br /> California High -Speed Rail Authority <br /> 925 L Street, Suite 1425 <br /> Sacramento, CA 95814 <br /> Dear Mr. Leavitt: <br /> RE: Comments on Notice of Preparation of a Joint Environmental Impact <br /> Report/Environmentall Impact Statement for the Altamont Corridor Rail <br /> Project <br /> Thank you for the opportunity to comment on the Notice of Preparation (NOP) of a Joint <br /> Environmental Impact Report/Environmental Impact Statement for the Altamont Corridor <br /> Rail Project. While the City of Pleasanton supports improving/expanding regional rail <br /> service, there are several concerns the City of Pleasanton would have if a new regional rail <br /> corridor or station were proposed through or adjacent to the City of Pleasanton. The City of <br /> Pleasanton respectfully submits the following comments: <br /> 1. The City of Pleasanton does not support high -speed rail running through Pleasanton.' <br /> The EIRIEIS should include one or more project alternatives that does not include <br /> running the rail corridor through Pleasanton. <br /> 2. There appears to be potential significant environmental impacts to Pleasanton that will <br /> need to be analyzed in the EIR/EIS. The City of Pleasanton is particularly concerned that <br /> the following potential impacts be thoroughly analyzed in the EIR/EIS: <br /> • Public Health and Safety <br /> • Noise <br /> • Vibration <br /> • Odors <br /> • Electric and Magnetic Fields <br /> • Potential conflicts with existing land use plans <br /> • Physical division of an established community <br /> • Air Quality <br /> 'Circulation Element, City of Pleasanton General Plan 2005 -2025 <br /> COMMUNITY DEVELOPMENT P. O. BOX 520, Pleasanton, CA 94566 - 0802 <br /> Planning Building & Safety Engineering Traffic Inspection <br /> 200 Old Bernal Ave. 200 Old Bernal Ave. 200 Old Bernal Ave. 200 Old Bernal Ave. 157 Main Street <br /> (925) 931-5600 (925) 931-5300 (925) 931-5650 (925) 931-5650 (925) 931-5680 <br /> Fax: 931 -5483 Fax: 931 -5470 Fax: 931 -5479 Fax: 931 -5479 Fax: 931 -5484 <br />
The URL can be used to link to this page
Your browser does not support the video tag.