My WebLink
|
Help
|
About
|
Sign Out
23
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
041911
>
23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2011 1:11:11 PM
Creation date
4/13/2011 12:39:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/19/2011
DESTRUCT DATE
15Y
DOCUMENT NO
23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> In 2008 the Altamont Corridor was studied by the California High Speed Rail Authority <br /> as a candidate route to the San Francisco Bay Area in the Statewide High Speed Train <br /> (HST) System. The Authority, after further evaluation of the Altamont and Pacheco <br /> corridors selected the Pacheco Pass as the preferred route for the California HST <br /> System. However, the Authority did recognize that the Altamont Corridor has a <br /> significant ridership that would remain underserved by the Pacheco Pass alignment and <br /> recommended improving the Altamont Corridor as a complementary regional corridor to <br /> the California HST System. <br /> The Authority has worked under agreement with a regional partner, the San Joaquin <br /> Regional Rail Commission (SJRRC), to plan a joint -use rail line through the Altamont <br /> Pass that would support new regional intercity and commuter passenger rail services <br /> operating in northern California between Stockton and San Jose, as well as eastern and <br /> southern Alameda County. The Authority and the SJRRC are working together to <br /> develop a new joint -use rail line to improve connectivity and accessibility between the <br /> northern San Joaquin Valley and the Bay Area. This project is identified as the Altamont <br /> Corridor Rail Project and will be designed and equipped to accommodate electrified <br /> lightweight passenger trains and could be used by HST - compatible equipment. <br /> The City of Pleasanton has been working with the High Speed Rail Authority as well as <br /> other local and regional agencies to develop a plan and approach to address the <br /> regional rail needs of the area through the Altamont Corridor Rail Project. <br /> DISCUSSION <br /> The Altamont Corridor Rail Project runs from Stockton to San Jose encompassing 110 <br /> miles of potential track length. To initiate the project, the Altamont Corridor Partnership <br /> Working Group (the <br /> Working Group) was <br /> established by the <br /> Authority to bring together " "'""''"""" <br /> xor�ton 1 •ma A.)) <br /> local partners for the ► wmol, 1,<N• <br /> purpose of identifying _ u; ttttt liner lo <br /> 1"" Ni,.all .Ilan 0l 0llV <br /> goals, objectives, and key ""'"x' "'°� ~ ~4.2) <br /> features of a joint use � <br /> Mlnu.eA ll.l,t m Un,l •.t 1 <br /> (Area l) White <br /> regional rail improvement = Onion (Ny <br /> in the Altamont Corridor. ' .,.,, °' r�llari, -� "' " ° `" � a" T <br /> IN.•.i 11 <br /> I <br /> INN% I n 1 000 / 5N 111 (INCA I .!) <br /> rW <br /> Noovo rrr.°nVlrlli <br /> rwrCrNYMM Wri]i <br /> The first goal of the <br /> i.MCwwY !. NNNNN. 11rlarll <br /> . � Son wt co 1 rmrwl (Iw• I.I) ..n rww <br /> Project is to establish a WMtr '"': � <br /> 4 .,....., - .rrwran <br /> N MIr.M,II..2 Nonn <br /> I ist of potential route "I = A m a» '" ;.:"°"�'""'" <br /> : INI <br /> alignments which will later <br /> evaluated in detail in <br /> an environmental report. AECOM was hired by the High Speed Rail Authority to <br /> develop the Preliminary Alternatives Analysis. This analysis was completed and <br /> presented to the California High Speed Rail Authority Board on February 3, 2011. The <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.