My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
031511
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 2:27:06 PM
Creation date
3/9/2011 2:52:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/15/2011
DESTRUCT DATE
15Y
DOCUMENT NO
02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT FOR GOODS / SERVICES <br />OR check this box [1 f payment schedule is described on an attachment. <br />ATTACHMENT A <br />THIS AGREEMENT is made and entered into this day of February, 2011 by and between <br />CDCE Engineered Solutions, ( "Contractor "), whose address is 22641 Old Canal Road, Yorba Linda, CA <br />92887, and telephone number is ;800) 373 - 5353 and the City of Pleasanton, a municipal corporation <br />("City"). <br />In consideration of the mutual promises set forth in this Agreement, the parties agree as follows: <br />1. Goods to be provided / services to be performed. The goods / work will consist of: Provide <br />Computer hardware, mounting equipment, power system, cabling, antenna, and GPS receivers <br />for the purpose of a complete MDC — Mobile Data Computer — replacement for the Livermore - <br />Pleasanton Fire Dept. Services to include full removal of existing legacy equipment and the <br />installation of new hardware. Scope of Work is noted in Exhibit "A" check this box 0 if <br />the goods/ work is described on an attachment. Contractor shall begin work by April 1 2011 <br />and complete by June 30, 2011 <br />2. Compensation. City shall pay Contractor as follows: Upon receipt of any procured hardware <br />equipment and/or after the completion of a fully installed MDC <br />Total Project Cost: $103,462.38 — as noted in Exhibit `B" <br />3. Method of Payment. Payment shall occur upon completion of work, acceptance by City staff, <br />and submission by Contractor of a request for payment. Requests submitted promptly as of the <br />20th day of each month will be paid by the 10th day of the following month. <br />4. Indemnification. Contractor shall indemnify, save and hold harmless from and defend the City, <br />members of the City Council and their agents, servants and employees, against any and all <br />claims, costs, demands, causes of action, suits, losses, expense or other detriment or liability <br />arising from or out of acts or omissions of Contractor, its agents, sub - contractors, officials or <br />employees, in connection with the execution of the work covered by this Contract or any <br />amendments thereto. <br />5. Insurance. During the term of this Agreement, Contractor shall maintain in full force and effect <br />at its own cost and expense the following insurance coverage: <br />
The URL can be used to link to this page
Your browser does not support the video tag.