My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
030111
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2011 2:46:15 PM
Creation date
2/24/2011 2:46:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2011
DESTRUCT DATE
15Y
DOCUMENT NO
03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton P2010.000.343 <br /> Pumping Station S -6 Replacement Project No. 012027 August 16, 2010 <br /> PROPOSAL FOR CONSTRUCTION OBSERVATION Revised August 18, 2010 <br /> AND MATERIALS TESTING SERVICES Page 2 <br /> SCOPE OF SERVICES <br /> We developed our anticipated scope of services from your REP dated August 5, 2010, our brief <br /> discussions and the project plans titled "Sanitary Sewer Lift Station S -6 Replacement, project <br /> No. 012027" developed by Carollo Engineers, dated June 2010. According to the plan notes, <br /> special inspection is required regarding foundation excavations, engineered fill, reinforced <br /> concrete, structural steel fabrication in the shop and field, high strength bolting, mechanical and <br /> epoxy -set anchors and structural masonry. <br /> We have prepared a fee estimate based solely on the project plans and our experience with <br /> similar projects. Since this fee estimate is based solely on preliminary or assumed construction <br /> schedules, it may not be an accurate reflection of the actual fee. Time required for various <br /> aspects of the work are highly dependent on the size of the trade crews and their schedules, over <br /> which we have no control. Should the construction schedule require more time than is estimated <br /> herein, our contract fees will be adjusted accordingly. Changes in scope, repair work, scheduling <br /> and /or contract terms and conditions may also result in adjustments to our fees. Our actual budget <br /> will be determined by the time required for construction and may vary due to the actual construction <br /> progress. <br /> PREFERRED FEES <br /> Please note that although ENGEO is a member of Operating Engineers Local No. 3, we do not <br /> bill our projects in 4- and 8 -hour increments as do many of our competitors. Beyond a 2 -hour <br /> minimum charge for show -up, our time is billed in real -time, portal -to- portal, 1/2-hour <br /> increments. We are waiving the 2 -hour show -up fee for sample pick -ups and charging only <br /> 1 hour per event. Moreover. we are waiving the Prevailing Wage mark -up of $l5 /hour as <br /> presented on our Preferred Client Fee Schedule. <br /> Details of our estimated time and rates are provided on the attached Special Inspection and <br /> Materials Testing Fee Estimate Details. We estimate that our fee for providing the special <br /> inspection services as outlined above will be an estimated S24,495 to be billed on a <br /> time- and - expense basis, in accordance with the attached fee schedule. <br /> AUTHORIZATION <br /> If you are in agreement with the scope of services and fees outlined above, please issue your <br /> standard authorization in accordance with the previously executed master agreement with the <br /> City of Pleasanton. Normally, services are unable to commence without prior receipt of an <br /> executed agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.