My WebLink
|
Help
|
About
|
Sign Out
PC 2002-41
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2002
>
PC 2002-41
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:49:07 PM
Creation date
4/16/2003 8:11:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/10/2002
DOCUMENT NO
PC 2002-41
DOCUMENT NAME
PUD-14
NOTES
GHC INVESTMENTS, LLC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
unit. There shall be a two-way clean-out on the gravity sanitary sewer lateral <br />located at the back of the Public Service Easement. <br />82. All streets designed to have no pazking on one or more sides shall be posted in <br />accordance with State law to advise of the "no pazking" restrictions. <br />83. The curb returns shall be as follows: <br />a. In-tract, face-of--curb returns shall be 25-foot minimum. <br />b. Notwithstanding the above, all turns shall be checked and designed to <br />allow the safe maneuvering of fire trucks, moving vans, etc. <br />84. All roof leaders shall be connected to the street gutter unless otherwise <br />approved by the City Engineer. <br />85. The existing septic tank and leach field to the houses located on the <br />property shall be abandoned per Alameda County Health Department <br />regulations. <br />86. Unless used for landscape/vineyazd irrigation, the existing wells located <br />on the property shall be abandoned per Zone 7 standazds. <br />87. All subdrains shall have clean-out installed at the beginning of the pipe. <br />The bottom of the pipe shall terminate in a storm drain or other storm <br />drain outfall, subject the approval of the City Engineer. The project <br />developer's engineer shall submit a final subdrain location map to the City <br />Engineer prior to the City's acceptance of the Public Improvements. It <br />shall be the responsibility of the homeowner to relocate the subdrains if, <br />during the excavation of a pool or other subsurface structure, the subdrains <br />aze encountered. All lots covered by this PUD Development Plan shall <br />have disclosures identifying the locations of the subdrains to the future <br />homeowners. The disclosure shall be recorded over the lots by separate <br />instrument with recordation of the final subdivision maps. The disclosure <br />shall be reviewed by the City Attorney before recordation. <br />88. The project soils engineer shall review a lot drainage plan prepazed for the <br />project lots to ensure that proper drainage measures are included and <br />forward his/her analysis and compliance with the recommendations in the <br />project geotechnical studies to the Planning Director prior to the issuance <br />of a building permit for the lots. The toe of cut slopes shall be designed <br />with subdrains. Said drains shall be connected to the street gutter or other <br />means determined to be acceptable to the City Engineer. <br />Conditions of Approval Page 22 of 28 8/2/02 <br />Greenbriaz Homes (PUD-14) <br />
The URL can be used to link to this page
Your browser does not support the video tag.