My WebLink
|
Help
|
About
|
Sign Out
PC 2002-31
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2002
>
PC 2002-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:47:19 PM
Creation date
4/16/2003 7:34:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/14/2002
DOCUMENT NO
PC 2002-31
DOCUMENT NAME
VINEYARD AVINUE CORRIDOR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H. The City and the District have explored options which would fund and construct <br />the realigned Vineyazd Avenue and selected utility segments which would allow <br />the school to be built and operated. Funding by the City and District of the <br />Phase I improvements, as described below, will exceed their respective ultimate <br />pro rata shares of the cost of such improvements, making them eligible for <br />reimbursement. Reimbursement depends on the ultimate development of the <br />pazcels within the Corridor, including the Property. <br />I. The Specific Plan specifies the policies associated with the dedication and/or <br />acquisition of the rights-of--way for the realigned Vineyazd Avenue and school <br />loop road. It was contemplated that dedication would occur as projects develop, <br />and any acquisition would occur as necessary to incorporate the required <br />infrastructure. That portion of the Vineyazd Avenue right-of--way within the <br />Property (approximately 1.14 acres) is to be dedicated as a condition of <br />development. <br />In order to construct the roadway improvements contemplated by the City and the <br />District in a financially feasible way, the right-of--way must be dedicated at no <br />cost at this time, with eventual payment, if contemplated in the Specific Plan, <br />taking place as development occurs, as originally contemplated. <br />Revision #3, Draft Hahner Development Agreement Page 4 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.