Laserfiche WebLink
e.) Create a contained and covered area on the site for the storage of bags, <br />cement, paints, flammable, oils, fertilizers, pesticides, or any other materials used <br />on the project site that have the potential for being discharged to the storm drain <br />system through being windblown or in the event of a material spill. <br />E) Never clean machinery, tools, brushes, etc., or rinse containers into a <br />street, gutter, or storm drain. <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations <br />do not discharge wash water into street gutters or drains. <br />h.) Construction access routes shall be limited to those approved by the City <br />Engineer or Chief Building Official and shall be shown on the approved grading <br />plan. <br />{end} <br />