My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
010411
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 1:52:12 PM
Creation date
12/28/2010 1:52:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/4/2011
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Shear and Roof Inspection. A lateral bracing, roof framing and sheathing <br /> inspection shall be made before any weather protection covering or roofing <br /> material is installed on the walls or roof of any building. <br /> 5. Plumbing, Mechanical, Gas and Electrical Inspection. Rough inspection of <br /> plumbing, mechanical, gas and electrical systems shall be made prior to covering <br /> or concealment, before fixtures or appliances are set or installed, and prior to <br /> framing inspection. <br /> 6. Frame Inspection. Framing inspections shall be made after the roof deck or <br /> sheathing are approved and the structure is adequately protected from weather <br /> intrusion, all framing fireblocking and bracing are in place and pipes, chimneys <br /> and vents to be concealed are complete and the rough electrical, plumbing, <br /> heating, wiring, piping and ducts are approved. <br /> 7. Sprinkler System Pre- Concealment Inspection. Fire sprinklers shall be installed <br /> in all required locations, and the sprinkler piping installation shall be tested and <br /> inspected prior to the concealment of any sprinkler system piping. <br /> 8. Energy Efficiency Inspections. Inspections shall be made to determine <br /> compliance with Title 24, Part 6 and shall include, but not be limited to, <br /> inspections for: envelope insulation R- and U- values, fenestration U- value, duct <br /> system R- value, and HVAC and water- heating equipment efficiency. Wall and <br /> concealed ceiling insulation inspections are required to be made after the frame <br /> inspection is approved and before being covered. <br /> 9. Lath and /or wallboard Inspection. Lath and gypsum board inspections shall be <br /> made after lathing and gypsum board, interior and exterior, is in place, but before <br /> any plastering is applied or gypsum board joints and fasteners are taped and <br /> finished. <br /> Exception: Gypsum board that is not part of a fire - resistance -rated assembly. <br /> 10. Fire - resistance -rated Construction Inspection. Wherever fire - resistance -rated <br /> construction is required, the Building and Safety Official shall require an <br /> inspection of such construction after all lathing and /or wallboard is in place, but <br /> before any plaster is applied, or before wallboard joints and fasteners are taped <br /> and finished. Protection of joints and penetrations in fire - resistance -rated <br /> assemblies, smoke barriers and smoke partitions shall not be concealed from <br /> view until inspected and approved. <br /> 11. Other Inspections. In addition to the inspections specified above, the Building <br /> and Safety Official is authorized to make or require other inspections of any <br /> construction work to ascertain compliance with the provisions of this code and <br /> other laws that are enforced by the department of building safety. <br /> 12. Final Inspection. Final inspection shall be made after the permitted work is <br /> complete and prior to occupancy. <br /> 305A.7 Required Building and /or Property Service Equipment Inspections. <br /> 305A.7.1 General. For all stand alone plumbing, mechanical and electrical permits and <br /> all other building and /or property service equipment for which a permit is required by <br /> this code shall be inspected by the Building and Safety Official. Building service <br /> equipment intended to be concealed by a permanent portion of the building shall not be <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.