My WebLink
|
Help
|
About
|
Sign Out
PC 062602
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2000-2009
>
2002
>
PC 062602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 4:45:31 PM
Creation date
4/15/2003 8:29:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
6/26/2002
DOCUMENT NAME
PC 062602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/~ <br /> <br />Commissioner Arkin noted that he would like to see a sign designed by staff and <br />Ponderosa that would be displayed in the main sales office. He believed it was very <br />important for the key disclosures to be listed on this sign, such as airport location and <br />potential school locations. <br /> <br />Regarding storm drains, Commissioner Sullivan noted that he supported an open swale <br />on Martin, and would rather see that than an open pipe spilling the water into the Arroyo. <br /> <br />Ms. Hardy advised that was not feasible due to the grade change differences, which was <br />approximately five to six feet. She noted that the pump would defeat the purpose, because <br />it went uphill. <br /> <br />Commissioner Arkin noted that, in general, he was very pleased with the project. <br /> <br />Mr. Iserson advised the applicants that they would return for the Planning Commission <br />hearing on July 24, 2002. <br /> <br />Commissioner Sullivan noted that Item 6.b. would take between 30 to 45 minutes, but did <br />not want to begin the East Side Study at midnight. He apologized to those who stayed for <br />that item. He noted that it would be the first item on the next agenda. <br /> <br />b. <br /> <br />PUD-80-2-17D, E. W. Thorpe <br />Application for Planned Unit Development Plan design review approval to allow <br />construction of an approximately 22,660 sq. ft., two-story office building located <br />at 6612 Koll Center Parkway (southwest corner ofKoll Center Parkway and <br />Valley Avenue). The property is zoned PUD (Planned Unit Development) - I/C- <br />o (Industrial/Commercial - Office). <br /> <br />r' <br /> <br />Mr. Iserson summarized the staff report. He noted that this was the last site in the <br />complex to be developed, and recommended approval of this item. <br /> <br />Commissioner Roberts inquired whether there was a possibility of meeting the LEED <br />certification. Mr. Iserson replied that the applicant could respond to that question. <br /> <br />THE PUBLIC HEARING WAS OPENED. <br /> <br />In response to Commissioner Sullivan's question whether the colors on the illustration <br />were the actual colors, E.W. Thorpe (applicant) replied that they were. Commissioner <br />Sullivan expressed concern that they did not match the colors used in the surrounding <br />buildings. <br /> <br />Mr. Thorpe noted that the colors matched the colors on the other buildings. <br />Commissioner Sullivan noted that they did not appear to match. <br /> <br />r' <br /> <br />PLANNING COMMISSION MINUTES <br /> <br />June 26, 2002 <br /> <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.