My WebLink
|
Help
|
About
|
Sign Out
PC 050901
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2000-2009
>
2001
>
PC 050901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 4:37:18 PM
Creation date
4/15/2003 6:39:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
5/9/2001
DOCUMENT NAME
PC 05901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Commissioner Kameny moved to make the conditional use permit findings listed in the <br />r staff report and approve Case PCUP-29 subject to Exhibit "B." Commissioner Arkin <br />seconded the motion. <br /> <br />ROLL CALL VOTE <br /> <br />AYES: <br />NOES: <br />ABSENT: <br />ABSTAIN: <br /> <br />Commissioners Arkin, Harvey, Kameny, Maas, and Sullivan <br />None <br />Commissioner Roberts <br />None <br /> <br />Resolution No. PC-2001-23 was entered and adopted as motioned. <br /> <br />b. PDR-126. Patrick and Debra Pickerell <br />Application for design review approval to construct a 20,982-square-foot, one- and two- <br />story building and use determination for a design, tooling, and limited manufacturing use <br />located at 3283 Bernal A venue. Zoning for the property is PUD-C (Planned Unit <br />Development - Commercial) District. <br /> <br />"...-- <br /> <br />Mr. Pavan presented the staff report, providing an overview of the project and the proposed use. <br />He noted that the proposed business has many characteristics similar to the other uses that are <br />allowed by the Stanley Business Park PUD development plan, and staff believes the proposed <br />use is acceptable. He advised that staff feels that with the business operations the building can <br />achieve LEED certification status. He advised that the design of the building has been peer <br />reviewed by Larry Cannon, and Mr. Cannon is present this evening to answer any questions. Mr. <br />Pavan presented the color board, noting that staff feels the colors are different from those <br />traditionally used in Pleasanton, but feels the bright colors could be used as accent or trim colors. <br />He noted that the applicant is requesting that they be allowed to delay the installation of the <br />photovoltaic panels and that occupancy be allowed prior to the installation. He advised that staff <br />supports this modification. <br /> <br />Commissioner Maas noted that she checked with the City Attorney's Office and she does not <br />have a conflict of interest with this application because of the location of the site. <br /> <br />Commissioner Arkin asked about other potential long-term land uses in this area and inquired as <br />to whether this area is going to be a service area for residents. Mr. Pavan advised that staff has <br />received inquiries about a supermarket in the area located on the southeast corner of Bernal and <br />Stanley. He noted that staff s goal for the west side of Bernal is to preserve this area for service <br />commercial uses. <br /> <br />Commissioner Kameny stated that the proposed use for this building fits into the business park <br />based upon the Municipal Code. <br /> <br />In response to an inquiry from Commissioner Harvey, staff advised of other potential future uses <br />that would be allowed in this building. <br /> <br />,-- <br /> <br />May 9, 2001 <br /> <br />Page 10 <br /> <br />PLANNING COMMISSION MINUTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.