My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
120710
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2010 11:07:57 AM
Creation date
12/1/2010 1:00:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/7/2010
DESTRUCT DATE
15Y
DOCUMENT NO
18 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P z d <br /> STANLEY BLVD / DONATO BUILDERS o o e a g 3 <br /> as v tu <br /> 9. Reduce Pollution Entering the Home from the Garage <br /> rThis credit is a requirement <br /> TBD a Install Garage Exhaust Fan OR Build associated Detached Garage 0 <br /> Yes <br /> b. Tightly Seal the Air Banier between Garage and Living Area (Performance Test 1 <br /> Required) 1 - - - - <br /> Total Points Available in Structural Frame and Building Envelope 39 5 , _.... <br /> E. EXTERIOR _... _.._ - _ .._ 1 P <br /> 0. ossible Points <br /> TBD 1. Use Environmentally Preferable Decking 1 <br /> TBD 2. Flashing Installation Techniques Specified and Third -Party Verified 0 <br /> rThis credit is a reguirement associated with J4: EPA IAPI i <br /> TBD 3. Install a Rain Screen Wall System 0 <br /> Yes 4. Use Durable and Non - Combustible Siding Materials 1 <br /> Yes 5. Use Durable and Fire Resistant Roofing Materials or Assembly 2 <br /> Total Points Available in Exterior = 8} 3 _. <br /> F. INSULATION <br /> Possible Points <br /> 1. Install Insulation with 75% Recycled Content <br /> Yes a. Walls 1 <br /> Yes b. Ceilings 1 <br /> Yes c. Floors 1 <br /> Total Points Available in Insulation = 31 3 <br /> G. PLUMBING i t Possible Points <br /> 1. Distribute Domestic Hot Water Efficiently !, <br /> (Max. 5 points, G1a. is a Prerequisite for G1b.e) F <br /> Yes a. Insulate All Hot Water Pipes '. 2 <br /> rThis credit is a requirement associated with J4: EPA IAPI <br /> TBD b. Use Engineered Parallel Plumbing 1 0 <br /> TBD c. Use Engineered Parallel Plumbing with Demand Controlled Circulation Loop(s) i 0 <br /> TBD d. Use Traditional Trunk, Branch and Twig Plumbing with Demand Controlled 0 <br /> Circulation Loop(s) <br /> TBD e. Use Central Core Plumbing 0 <br /> 2. Water Efficient Fixtures <br /> TBD a. High Efficiency Showerheads 52.0 Gallons Per Minute (gpm) at 80 psi '� 0 <br /> Yes b. High Efficiency Bathroom Faucets 5 1.5 gpm at 60psi 1 ' <br /> TBD c. High Efficiency Kitchen and Utility Faucets 52.0 gpm 0 <br /> 3. Install Only High Efficiency Toilets (Dual -Flush or 51.28 Gallons Per 2 <br /> Yes Flush (gpf)) <br /> Total Points Available in Plumbing = 12} 5 <br /> H. HEATING, VENTILATION & AIR CONDITIONING Possible Points <br /> 1. Properly Design HVAC System and Perform Diagnostic Testing <br /> TBD a. Design and Install HVAC System to ACCA Manual J. D, and S Recommendations 0 !. <br /> rThis credit is a requirement associated with J4: EPA IAPI <br /> TBD b. Test Total Supply Air Flow Rates 0 <br /> rThis credit is a requirement associated with J4: EPA IAPI <br /> TBD c. Third Party Testing of Mechanical Ventilation Rates for IAQ (meet ASHRAE 62.2) ',, 0 <br /> 2. Install Sealed Combustion Units 1 <br /> rThis credit is a requirement associated with J4: EPA IAPI <br /> TBD a. Fumaces 0 <br /> TBD b. Water Heaters 0 <br /> TBD 3. Install High Performing Zoned Hydronic Radiant Heating 0 <br /> Yes 4 Install High Efficiency Air Conditioning with Environmentally 1 <br /> Preferable Refrigerants <br /> 5. Design and Install Effective Ductwork <br /> Single Family Checklist <br /> © Build It Green New Home Version 4.0 Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.