Laserfiche WebLink
STANLEY BLVD / DONATO BUILDERS € = E 1 g = a o m <br /> TBD a. No Invasive Species Listed by Cal -IPC Are Planted , 0 <br /> TBD b. No Plant Species Will Require Shearing 0 <br /> TBD c. 75% of Plants Are Drought Tolerant, Califomia Natives or Mediterranean Species 0 <br /> or Other Appropriate Species -- { - <br /> 4. Minimize Turf in Landscape Installed by Builder <br /> TBD a. Turf Shall Not Be Installed on Slopes Exceeding 10% and No Overhead Sprinklers 0 <br /> Installed in Areas Less than 8 Feet Wide <br /> TBD b. Turf is Small Percentage of Landscaped Area (2 Points for 533 %, 4 Points for 510 %) 0 <br /> Yes 5. Plant Shade Trees Irrigation Systems . . <br /> 6. Install TBD ( 7. I System Uses <br /> Incorporate Inches B of Compost Controller <br /> n lbe Top 6 to 1 Inches of Soil 0 <br /> 8. Rain Water Harvesting System' <br /> TBD a. Cistem(s) is Less Than 750 Gallons 0. <br /> TBD b. Cistem(s) is 750 to 2,500 Gallons - - - - <br /> TBD c. Cistem(a) is Greater Than 2,500 Gallons 0_. - - <br /> TBD 9. Irrigation System Uses Recycled Wastewater ,. -. . <br /> TBD 10. Submetering for Landscape Irrigation i 0 _ <br /> 11 <br /> 11. Design Landscape to Meet Water Budget <br /> a. Install Irrigation System That Will Be Operated at 570% Reference ET 0 <br /> TBD (Prerequisites for Credit are C1. and C2.) <br /> TBD b. Install Irrigation System That Will Be Operated at 550% Reference ET 0 <br /> (Prerequisites for Credit are C1,C2, and C6a or C6b) <br /> 12. Use Environmentally Preferable Materials for 70% of Non - Plant <br /> TBD Landscape Elements and Fencing 0 ', <br /> A) FSC - Certified Wood, 8) Reclaimed, C) Rapidly Renewable, D) Recycled- Content <br /> ELFJnaer lointedorF).Losal <br /> Yes 13. Reduce Light Pollution by Shielding Fixtures and Directing Light 0 <br /> Downward i <br /> - - - Total Points Available in Landscape = 35 1 6 <br /> D. STRUCTURAL FRAME & BUILDING ENVELOPE , Possible Points <br /> 1. Apply Optimal Value Engineering <br /> TBD a. Place Joists, Rafters and Studs at 24 -Inch On Center !. 0 <br /> TBD b. Door and Window Headers are Sized for Load j 0 <br /> TBD c. Use Only Cripple Studs Required for Load l 0 <br /> 2. Construction Material Efficiencies . . <br /> TBD a. Wall and Floor Assemblies (Excluding Solid Wall Assemblies) are Delivered o <br /> 0% S <br /> Panelized from Supplier (Minimum of 80% Feet) <br /> TBD b. Modular Components Are Delivered Assembled to the Project (Minimum 25 %) 0 <br /> 3. Use Engineered Lumber <br /> Yes a. Engineered Beams and Headers 1 <br /> Yes b. Wood I- Joists or Web Trusses for Floors 1 <br /> TBD c. Engineered Lumber for Roof Rafters '', 0 <br /> TBD d. Engineered or Finger - Jointed Studs for Vertical Applications 0 <br /> Yes e. Oriented Strand Board for Subfloor 1 <br /> Yes f. Oriented Strand Board for Wall and Roof Sheathing 1 <br /> TBD 4. Insulated Headers F. - <br /> 5. Use FSC - Certified Wood <br /> TBD a. Dimensional Lumber, Studs and Timber (Minimum 40 %) 0 <br /> TBD b. Panel Products (Minimum 40 %) 0 ! <br /> 6. Use Solid Wall Systems (Includes SIPS, ICFs, 8 Any Non-Stick Frame !, <br /> Assembly) - - <br /> TBD a. Floors 0 <br /> TBD b. Walls 0 <br /> TBD c. Roofs .- -__.., <br /> TBD 7. Energy Heels on Roof Trusses 0 <br /> 175% of Attic Insulation Height at Outside Edge of Exterior Wall) <br /> 8. Install Overhangs and Gutters <br /> TBD ( a. Minimum 16 -Inch Overhangs and Gutters 0 <br /> TBD b. Minimum 24 -Inch Overhangs and Gutters 0 <br /> Single Family Checklist <br /> © Build It Green New Home Version 4.0 Page 2 of 7 <br />