b) Tenant improvement activities taking place within a completely enclosed structure <br />shall be limited to the hours of 7:00 a.m. to 8:00 p.m. Monday through Saturday <br />only. Tenant contractors operating past 5:00 p.m. shall only use the Bernal <br />Avenue driveway to enter /exit the site. <br />g ) <br />c) A construction staging plan shall be designated for all materials, equipment, and <br />vehicles including parking for construction works and personnel. <br />d) A construction truck route shall be designated to keep all construction traffic away <br />from nearby residential streets. Prior to construction, the construction traffic route, <br />construction hours, and contact names and telephone numbers shall be posted on <br />the driveway entrances, throughout the construction site, and in any construction <br />trailer(s). <br />e) Comprehensive traffic control measures shall be implemented, including <br />scheduling of major truck trips and deliveries, to avoid peak travel hours. If <br />necessary, as determined by the Traffic Engineer, proper lane closure procedures <br />such as flagger stations, signage, cones, and other warning devices shall be <br />implemented during construction. <br />f) The haul route for all materials to and from this development shall be approved by <br />the City Engineer prior to the issuance of a permit, and shall include the provision <br />to monitor the street surfaces used for the haul route so that any damage and <br />debris attributable to the haul trucks is identified and corrected at the expense of <br />the project applicant or developer. <br />All internal combustion engines on grading or construction equipment used shall be <br />equipped with a muffler equal to or better than that supplied by the vehicle <br />manufacturer. All equipment shall be maintained in good mechanical condition so <br />as to minimize noise and air pollution from faulty engine, drive train, and other <br />components. No muffler or exhaust system shall be equipped with cutout, bypass, <br />or similar device intended to thwart quieting. <br />h) Dust control best management practices, as approved by the City Engineer, shall <br />be followed at all times during grading and construction operations. Such <br />measures may include watering of exposed surfaces twice a day, and more <br />frequent watering when wind speeds exceed 15 mph; covering of stockpiled earth; <br />covering of trucks hauling dirt if windy conditions prevail. Failure to keep dust <br />under control may result in the stoppage of all work until a modified plan <br />acceptable to the City Engineer is approved and implemented. <br />Except for security trailers staffed by licensed security personnel, at no time shall <br />campers, trailers, motor homes, or any other vehicle be used as living or sleeping <br />quarters on the construction site. All such vehicles shall be removed from the site <br />at the end of each workday. Construction trailers shall be allowed to be placed on <br />the project site for daily administration /coordination purposes during the <br />construction period. <br />j) <br />All Urban Storm Water Construction Requirements listed further in these conditions <br />of approval shall be implemented. <br />20. At least one week prior to the start of construction, the project applicant or developer <br />shall distribute to adjoining residential owners and apartment tenants, as determined by <br />4 <br />