Laserfiche WebLink
2. Whether the proposed development plan modification is compatible with <br /> previously developed properties located in the vicinity of the plan: <br /> • The Bernal Property Specific Plan and PUD development plan already allows <br /> the site to be developed with an eight - building office development with a variety <br /> of commercial, office, arid research and development uses. The proposed <br /> development will allow commercial /retail and office uses in close proximity to the <br /> nearby neighborhoods and business parks with a variety of goods and services. <br /> The commercial /retail component of the proposal provides opportunity for <br /> residents to include shopping into their morning /evening commute thereby not <br /> having to drive across town for such goods and services. The employment <br /> opportunities provided by the office buildings will augment the City's tax base. <br /> • The residential areas and businesses located across Valley Avenue and Bernal <br /> Avenue, respectively, means walk -in traffic to these uses thereby reducing <br /> Citywide trips in this area. The development allowed by this modification is <br /> consistent with the development pattern of the area. <br /> • Accesses to Bernal Avenue and Valley Avenue are located in a manner that <br /> maintains the existing traffic roundabouts, which is consistent with City <br /> standards, and which provides adequate development access and emergency <br /> vehicle access. <br /> • All construction activities are limited to the hours of 7:00 a.m. to 6:00 p.m., <br /> Monday through Friday and 8:00 a.m. to 5:00 p.m. on Sunday. All construction <br /> equipment must meet Department of Motor Vehicles (DMV) noise standards and <br /> shall be equipped with muffling devices. <br /> Staff, therefore, believes that this finding can be made. <br /> 3. Whether the proposed development plan modification is compatible with the <br /> natural, topographic features of the site: <br /> • The site is flat and will accommodate the proposed development with standard <br /> City practices for drainage flows and stormwater runoff treatment. <br /> • The site is designed to drain to on -site vegetative swales designed to pretreat <br /> stormwater runoff. <br /> Therefore, staff believes that this finding can be made. <br /> 4. Whether grading in conjunction with the proposed development plan <br /> modification takes into account environmental characteristics and is <br /> designed in keeping with the best engineering practices to avoid erosion, <br /> slides, or flooding, and to have as minimal an effect upon the environment as <br /> possible. <br /> • The site is relatively flat. Grading will be limited to maintaining the present north <br /> to south drainage pattern so that storm water will drain naturally through on -site <br /> vegetative swales and then to the City's stormwater detention /treatment ponds. <br /> Pleasanton Gateway Page 32 of 35 August 25, 2010 <br />