Laserfiche WebLink
All delivery trucks and vendors shall use the Bernal Avenue driveway to enter /exit the <br /> development. All tenants shall notify their vendors and delivery personnel of the <br /> approved delivery route and times. <br /> 6. The project applicant or developer shall effectively screen from view all ducts, meters, <br /> emergency power generators, fire sprinkler risers, and any other mechanical equipment, <br /> whether on the structure or on the ground, with materials architecturally compatible with <br /> the main structure. Screening details shall be shown on the plans submitted for <br /> issuance of building permits, the adequacy of which shall be determined by the Planning <br /> Division. All required screening shall be provided prior to occupancy. <br /> 7. The project applicant or developer shall seek City Council approval to allow on -site <br /> enforcement of the applicable provisions of the California Vehicle Code within the Phase <br /> I and Phase II parking lots /drive aisles. Petitioning for such approval shall precede <br /> issuance of the first building permit for these development phases. <br /> 8. The project applicant or developer shall install water conservation devices in the Phase I <br /> and Phase II buildings and landscape areas to the satisfaction of the Community <br /> Development Director. The water conservation devices shall be stated on the building <br /> plans and the landscape plans submitted with each building permit within each project <br /> phase. (Pleasanton General Plan, Program 1.7). <br /> 9. Pursuant to Government Code sections 66020 and 65009, the 90 -day protest period <br /> regarding fees and exactions shall commence on the date of the City Council's approval <br /> of this project. <br /> 10. Prior approval from the Planning Division is required before any changes are made in <br /> site design, building design, grading, etc. In lieu of a PUD Development Plan <br /> modification, the Community Development Director may authorize the design review <br /> process for minor building additions, site and landscape plan modifications, and /or <br /> grading /engineering modifications, and for outdoor dining with /without alcoholic <br /> beverages, master sign programs, modification(s) to a master sign program, and /or <br /> individual business /tenant signs. <br /> Building Design <br /> 11. There shall be no corporate, franchise, and /or thematic building design of any type <br /> allowed with Phase I and Phase II of this development. All requests to modify the <br /> building architecture shall be reviewed by the Planning Division to determine corporate, <br /> franchise, and /or thematic building design and that, if proposed, shall be subject to a <br /> PUD major modification subject to review by the Planning Commission and then by the <br /> City Council. <br /> 12. All HVAC equipment, antennas, satellite receiving stations, etc., shall be located within <br /> the buildings' roof- equipment wells, and shall project no higher than a horizontal plane <br /> defined by the top -edge of the equipment screens /parapet walls. Final determination of <br /> the freeway screening for the Major Tenant #1 shall be made with the Planning <br /> Division's review of the building permit. If necessary, the applicant may increase the <br /> height of the Major Tenant #1 building from 26 feet to 28 feet. All HVAC equipment shall <br /> be constructed and operated in such a manner that noise emanating from it will not be <br /> perceptible beyond the property plane of the overall project site. <br /> 2 <br />