My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
100510
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2010 2:13:45 PM
Creation date
9/29/2010 2:13:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/5/2010
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> This project is part of the annual maintenance program and will include removal and <br /> replacement of sidewalk that presents tripping hazards and damaged curb & gutter. <br /> Access ramps that are damaged or missing near the project work area will also be <br /> replaced to meet the current ADA standards. The locations are selected from the Street <br /> Department work order list and also from direct requests from residents to the Traffic <br /> Division (see Attachment 1 for project locations). <br /> DISCUSSION <br /> Bids <br /> Sealed bids for this project were opened on September 14, 2010. There were a total of <br /> eleven bids received ranging from $123,405 to $179,804, compared with the engineer's <br /> estimate of $151,000 for the project (see Attachment 2, Bid Summary). <br /> The low bid of $123,405 was received from JJR Construction, Inc. of San Mateo, <br /> California. Since all bid documents were found to be in order and past work performed <br /> by this contractor was verified to be satisfactory, staff is recommending award of the <br /> construction contract to this firm. <br /> Budget <br /> Staff recommends that the construction contingency amount for this project be set at <br /> 20% of the construction contract due to potential expansion of project limits due to latent <br /> defects that become apparent during the demolition phase. <br /> Schedule <br /> The proposed schedule for the subject project is as follows: <br /> Approval of Plans and Specifications and Award of Contract October 5, 2010 <br /> Start of Construction November 1, 2010 <br /> End of Construction December 2010 <br /> Submitted by: Fiscal Review: Approved by: <br /> rian Do /)14 <br /> an Emily Wagner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. List of locations <br /> 2. Bid Summary <br /> 3. Funding and Estimated Expenditure Summary <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.