My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
081710
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2010 4:36:49 PM
Creation date
8/10/2010 4:36:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/17/2010
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The subject project was authorized by the City Council as part of the 2010 -11 Capital <br /> Improvement Program mid -term update, with an approved budget of $2,250,000. This <br /> funding includes Gas Tax and Measure B monies. <br /> The current project consists of approximately 600,000 square feet of pavement <br /> resurfacing for the following streets. <br /> STREET NAME BEGIN LOCATION END LOCATION AREA TREATMENT <br /> STONEDALE DR SPRINGDALE AVE MAYWOOD DR 93,153 OL /F <br /> HILLSDALE CT SPRINGDALE AVE END 9,880 OL /F <br /> LIVE OAK CT MAYWOOD DR END 9,822 OL /F <br /> GLENBROOK CT SPRINGDALE AVE END 22,762 OL /F <br /> LYNBROOK CT MUIRWOOD DR END 10,914 OL /F <br /> JAYBROOK CT STONEDALE DR END 9,764 OL /F <br /> ORLOFF DR KOLLN ST END 46,675 OL /F <br /> SCHWEEN CT ORLOFF DR END 16,307 OL /F <br /> HALL CT ORLOFF DR END 8,314 OL /F <br /> BLACOW CT ORLOFF DR END _ 11,487 OL /F <br /> BLACOW ST ORLOFF DR VALLEY AVE 9,828 OL /F <br /> PHOEBE CT ORLOFF DR END 6,192 _ OL /F <br /> VIA ESPADA BLACK AVE BLACK AVE 95,350 OL /F <br /> CORTE CALERA VIA ESPADA END 5,903 OL /F <br /> PASEO SANTA CRUZ VALLEY Ave VIA ESPADA 5,206 OL /F <br /> CORTE DE LA JARA VIA ESPADA END _ 17,712 OL /F <br /> CAMINO BRAZOS BLACK AVE BLACK AVE 65,762 OL /F <br /> CORTE BRAZOS CAMINO BRAZOS _ END 6,864 OL /F <br /> LONGSPUR WAY BLACKBIRD DR BLACKBIRD DR 35,366 OL /F <br /> GANNER CT SANDERLING DR END 14,832 OL /F <br /> PIPIT CT SANDERLING DR END 16,556 OL /F <br /> LARRIKEET CT BLACKBIRD DR END 17,951 OL /F <br /> SANDERLING WAY WOODTHRUSH RD WOODTHRUSH RD 36,780 OL /F <br /> SKIMMER CT BLACK BIRD DR END _ 23,380 OL /F <br /> CURLEW CT BLACK BIRD DR END 6,600 OL /F <br /> (*) OL /F: Overlay with Fabric <br /> Staff recommends the use of the pavement fabric construction method of overlay for <br /> this project. This construction method involves grinding the edges of the existing <br /> pavement and placing a new surface course of 1.75" or 2" thickness of asphalt concrete <br /> on top of the existing pavement. <br /> DISCUSSION <br /> Bids <br /> Sealed bids for this project were opened on July 28, 2010. There were five (5) bids <br /> received, ranging from the low bid amount of $998,249.45 to $1,283,714 as compared <br /> to the engineer's estimate of $1,070,000 for the project. (See attached Bid Summary.) <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.