My WebLink
|
Help
|
About
|
Sign Out
CCMIN061510
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2010-2019
>
2010
>
CCMIN061510
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 12:15:53 PM
Creation date
7/27/2010 12:15:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
PERMANENT
DOCUMENT NO
CCMIN061510
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Cook- Kallio thanked Mr. Culver for all he has done. She has enjoyed working <br /> him and wished him the best of luck. Vice -Mayor Thorne echoed her thanks. Councilmember <br /> McGovern said she appreciated how he has prepared the budget documents in a way that was <br /> easy for the public to read. She thanked him, and wished him luck as well. Councilmember <br /> Sullivan echoed comments, stating that Mr. Culver has been tasked with managing the City's <br /> finances through a very difficult time but he always felt comfortable with the information and <br /> recommended strategies presented. <br /> Assistant City Manager Bocian noted the Capital Improvement Plan actually looks at the next <br /> three years; however, only the first year is funded. The focus of this CIP is to ensure that the <br /> numbers are accurate with the least possible adjustment possible. He shared a slide outlining <br /> financial resources for the upcoming year, noting that the Streets amount shown is equal to 39% <br /> of revenue and Miscellaneous has decreased to 4.6% of revenue; the CIP is trending more <br /> towards an emphasis on Streets, Water, and Sewer programs over the next three years. He <br /> then shared a comparable slide on expenditures, which indicate similar changes and trends. <br /> Mr. Bocian reviewed recommended adjustments, including an increase in highway revenue <br /> resulting from Proposition 1 B; there was concern that this revenue source would be cut last year <br /> but it did pass with the State budget and has been included. He noted a significant reduction in <br /> development fees from a projected $3.5 million to $512,000 and referred the Council to page 49 <br /> of the CIP for other changes. He also noted that the CIP budget is based solely on revenues <br /> that have been secured and, therefore, even sizable decreases do not represent a significant <br /> change in planned projects. <br /> Mr. Fialho explained that from the mid -1990s through 2007 or 2008, the City transferred <br /> approximately $5 million annually into the CIP to fund a number of miscellaneous projects. The <br /> expenditure reduction in miscellaneous projects seen here is in part due to the fewer projects <br /> needed as the City reaches built out, and in part because that funding has been redirected to <br /> help balance the operating budget. Since this Council has been elected, those fund sources <br /> have been used to fund the Kottinger Restoration Project, Bernal Property, Alviso Adobe, Sports <br /> Complex, Veteran's Hall, downtown restrooms, and soon to be Firehouse Arts Center. He noted <br /> there are no projections for those sorts of funds in the CIP for at least the next three years, <br /> perhaps longer. <br /> Mr. Bocian discussed the five projects added to the CIP including: 1) Police Department solar <br /> improvement project funded primarily by grants, 2) Interactive Voice Response System, 3) <br /> Intersection improvements at Stoneridge Drive and Stoneridge Mall Road, 4) Intersection <br /> improvements at various locations, and 5) a reserve for Aquatic Center maintenance <br /> improvements. <br /> Mayor Hosterman inquired about the savings potentially realized from the solar installation <br /> project. Mr. Bocian could not confirm, but said it should be available upon full design of the <br /> project. <br /> Vice -Mayor Thorne inquired as to the total cost of the Aquatic Center improvements, and Mr. <br /> Bocian stated it is approximately $3.6 million. <br /> Mr. Bocian discussed amended projects, which have generally been adjusted only to reflect the <br /> revenue situation, as well as eliminated projects. He stated that staff undertakes a very detailed <br /> project process each year to evaluate all CIP projects. In addition, a reorganization of the <br /> City Council Minutes Page 7 of 11 June 15, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.