Laserfiche WebLink
Table of Contents <br /> INTRODUCTION 1 <br /> GENERAL BACKGROUND 1 <br /> PURPOSE 1 <br /> SCOPE 1 <br /> DISCLAIMER 2 <br /> SYSTEM DEVELOPMENT CHARGES 3 <br /> BASIC METHODOLOGIES 3 <br /> ASSET VALUATION METHODS 4 <br /> Original Cost 4 <br /> Reproduction Cost 4 <br /> Depreciation 5 <br /> SYSTEM DEVELOPMENT CHARGE DETERMINATION METHODS 5 <br /> System Buy -1n Method 5 <br /> Incremental Cost Pricing Method 6 <br /> Value- oj-Service Method 6 <br /> LEGAL. REQUIREMENTS IN CALIFORNIA 6 <br /> Assembly Bill 1600 6 <br /> PROPOSED METHODOLOGY 7 <br /> APPENDIX A FIXED ASSET LISTING 14 <br /> APPENDIX B DSRSD ENGINEERS REPORT 20 <br /> APPENDIX C LAVWMA DESCRIPTION 26 <br /> APPENDIX D— PROJECTED DUES 28 <br /> APPENDIX E CAPITAL IMPROVEMENT PROGRAM 29 <br /> APPENDIX F— PROJECT COST ALLOCATION POLICY 31 <br /> List of Tables <br /> TABLE 1 LIST OF CIP AT FY 2008/09 8 <br /> TABLE 2 DEVELOPMENT OF REGIONAL CONNECTION FEE 10 <br /> TABLE 2A REGIONAL CONNECTION FEE SCIIEDUI F 10 <br /> TABLE 3 EXPANSION FUND CAPITAL FINANCING PLAN WITH BUY -IN 13 <br />