Laserfiche WebLink
BACKGROUND <br /> The City of Pleasanton contracts with the Dublin San Ramon Services District (DSRSD) for <br /> wastewater treatment and disposal services. This contractual relationship has existed since <br /> the late 1970's when the City's Wastewater Treatment Plant was decommissioned. The <br /> current agreements between the City and DSRSD (dated 1992 and thereafter) provide for <br /> DSRSD to set regional sewer connection fees for the expansion of the treatment plant <br /> located on Johnson Drive in Pleasanton and the Livermore Amador Valley Water <br /> Management Agency's (LAVWMA) pumping and pipeline facilities that export treated <br /> wastewater to the San Francisco Bay. <br /> The City and the District each operate their own local collection systems that transport <br /> wastewater to the District's Regional plant for treatment prior to eventual discharge to the <br /> San Francisco Bay. While the local rates differ between the City and the District customers, <br /> by contract the regional treatment, disposal and connection rates /fees must be the same. <br /> By contract, once any adjustments to the regional sewer connection fees are adopted by the <br /> DSRSD Board, the City must adopt these charges within sixty days. In 2009, DSRSD hired <br /> the consulting firm of Black Veatch to review if any changes were needed in the regional <br /> connection fees that are collected from new development to pay for the cost of expanding <br /> either the DSRSD regional wastewater treatment plant or the LAVWMA disposal facilities <br /> (2010 Study). The results of the 2010 Study were adopted by the DSRSD Board on June <br /> 15, 2010 with the changes in the sewer connection fees to be effective within DSRSD and <br /> the City on August 1, 2010. <br /> Changes to the Regional Connection Fees <br /> The study prior to the 2010 Study was performed during the 2006 -2008 time period and <br /> adopted to be effective July 1, 2008 (2008 Study). As a result of the 2008 Study the <br /> regional connection fee was established July 1, 2008 and then increased by the ENR <br /> escalator on July 1, 2009 and decreased by the ENR escalator on July 1, 2010 to its <br /> current level of $13,393 per single family equivalent demand. The results of the 2010 <br /> Study were that the connection fee should be increased from $13,393 to $13,840. <br /> The regional connection fee includes the cost of both the prior expansion of the DSRSD's <br /> wastewater treatment plant located in Pleasanton (known as the Phase IV Expansion) and <br /> LAVWMA "s Export Pipeline Expansion Project. The two projects required the issuance of <br /> approximately $186 million in bonds; currently $146 million is outstanding with an annual <br /> debt service payment of approximately $9.0 million payable from regional connection fees. <br /> On June 15, 2010, the DSRSD Board also adopted an ENR escalator to be applied <br /> annually to the portion of the fee representing the DSRSD Regional component ($8,210). <br /> The remainder of the fee ($5,630) is collected to fund the payment of the annual debt <br /> service on the outstanding bonds on the LAVWMA pipeline and will not be escalated <br /> annually. The table on the following page presents the regional sewer connection fees <br /> approved on June 15, 2010 by the DSRSD Board for implementation on August 1, 2010: <br /> Page 2 of 3 <br />