Laserfiche WebLink
DUBLIN SAN RAMON SERVICE DISTRICT <br /> REGIONAL CONNECTION FEES <br /> construction cost conditions. Additionally, an allowance of S15,437,125 was added to reflect work in <br /> progress for FY 08/09 as shown in Table 1. A summary of the District's asset listing used for the <br /> calculation of the RCLD is provided as Appendix A. <br /> Table 1 <br /> List of CIP at FY 2008/09 <br /> egional Expansion Fund Construction In ProIrees2009 <br /> WWTP Secondary Clarifier #3 Trough Repr 22,302.09 <br /> On Site Drainage (Sewer Sys Imprvmnts) 23,016.80 <br /> 24 -inch RAS Line Replacement 30,363.09 <br /> WWTP- Influent Swr Separation Metering 38,346.27 <br /> Photovoltaic System Evaluation 39,942.37 <br /> Environmental Services Records Mgt 51,346.48 <br /> Stmvite Control 54,346.32 <br /> DSRSD Regional Biosolids Facility 56,000.00 <br /> Cogeneration Engines Conversion 78,379.63 <br /> Facultative Sludge Lagoons Imp 105,760.99 <br /> District Office Improvements 113,695.29 <br /> SCADA System Master Plan 156,129.16 <br /> Wide Area Network Communications 190,987.05 <br /> Sludge Thickening Improvements 205,279.12 <br /> WWTP Odor Reduction Tower Rehab 214,789.01 <br /> WWTP Landscaping 256,349.45 <br /> WWTP Anaerobic Digester #4 363, 096.50 <br /> WWTP Operation Manual and Training 388,003.94 <br /> District Facilities Security Project 612,698.83 <br /> New Bar Screen 2,128,996.95 <br /> WWTP-Emergency Power System 2,720,901.20 <br /> WWTP-Maintenance Building 7,586,393.97 <br /> Grand Regional 15,437,124.51 <br /> Using information from the District's Master Plan, the average residential customer uses about <br /> 220 gallons per day (gpd). District engineering estimates indicate that the current treatment plant capacity <br /> is 49 MGD (peak wet weather flow). See attached Engineers Report (Appendix B) on treatment plant <br /> capacity. In addition, the cost of the LAVMA pipeline is allocated for purposes of asset recovery and debt <br /> service proportioning. The costs for the pipeline are categorized into expansion and pre expansion <br /> expenses. In order to ensure that each entity pays for their increased share of capacity, costs for the <br /> LAVWMA expansion have been separated as shown in Appendix C. <br /> It is the District's practice to phase in expansion needs over a fairly long period of time (greater <br /> than 5 years). In this manner, the cash flow impact of such improvements can be stabilized. Under the <br /> current CIP schedule, the District anticipates full expansion, which will bring the capacity of the <br /> treatment system (including disposal) to 17.8 MGD, will begin in FY 09/10, with the majority of the <br /> expansion projects occurring after FY 15/16. Following the approach adopted for the local collection <br /> system fee, the proposed methodology consists of two parts: a buy -in calculation and an incremental <br /> value. <br /> Black Veatch and District staff determined the number of new DUES joining the system by <br /> reviewing historical number of connections, the respective agencies' Master Plans, and current capacities. <br /> The timing of new connections, which plays a critical part in revenue collection, was determined through <br /> BLACK VEATCH 8 MAY 2010 <br />