My WebLink
|
Help
|
About
|
Sign Out
ORD 1139
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1101 - 1200
>
ORD 1139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 8:44:14 AM
Creation date
3/18/1999 5:32:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1139
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be a two lane roadway with turning lanes provided, all within <br /> a 72 foot wide + right-of-way. An appropriate center transition <br /> shall be designed. Vineyard Avenue shall be designed, and <br /> reconstructed if necessary, to provide adequate sight clearance <br /> for safe turning movements. Additional construction will be <br /> required on the south side of Vineyard Avenue to effect the <br /> required transition. <br /> <br />11. That City water and sewer service be provided to the Porter <br /> parcel per prior negotiations and agreements. <br /> <br />12. That the developer shall participate in the improvement of <br /> the off-site sanitary sewer mains to the extent required by <br /> the City Engineer at the time of tentative map aDDroval. <br /> <br />13. That approval of this project is subject to all Standard <br /> Conditions of Development except conditions 14, 20, 21, 25, <br /> 26, 27, 29, 31 and 46. <br /> <br />14. That the developer shall phase the project in equal increments <br /> over a four year period. <br /> <br />15. That the developer shall pay the entire cost of any signal <br /> phasing and turn lane modifications to the First Street and <br /> Vineyard Avenue intersection as determined necessary by the <br /> City Engineer. <br /> <br />16o That the developer shall pay the City $110,000 Prior to recording <br /> a final subdivision map or issuance of any building Dermits for <br /> this project. These funds are to be utilized by the City for <br /> a part of the cost of imDrovements needed for the connection <br /> of Valley Avenue to Bernal Avenue. <br /> <br />III <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.