Laserfiche WebLink
31. That a sanitary s'ewer sampling manhole be provided on the <br /> sanitary sewer lateral unless otherwise waived by the City <br /> Engineer. <br /> <br /> 32. That prior to issuance of a building permit, the developer <br /> shall pay the applicable Zone 7 and City connection fees and <br /> water meter cosL for any water meters (irrigation meters) not <br /> directly related to a building permit. <br /> <br /> 33. ThaL the developer dedicate to the City for street <br /> right-of-way purposes those parcels of land intended <br /> to be public streets. <br /> <br /> 34. That the developer grant an easement to the 'City ove~ <br /> those parcels shown as public service easements (P.S.E.) <br /> and which are approved by the City Engineer or other parcels <br /> which may be designated by the City Engineer. <br /> <br /> 35. That approval of the design for the line, grade, and <br /> structural sections for the. streets serving this develop- <br /> ment be withheld pending final engineering design and <br /> re~iew by the City Engineer. <br /> <br />36. That vertical P.C.C. curbs and gutters be constructed <br /> within this development unless otherwise approved by the <br /> City Engineer and that the curb and gutter be poured mono- <br /> lithically wi'~h the sidewalk when the sidewalk is adjacent. <br /> <br />37. That all existing wells, septic tanks or holding <br /> tanks on the site be properly sealed, filled and abandoned <br /> prior to ~he s~art of grading operations unless Zone 7 <br /> retains specific wells for observation wells, or <br /> special approval is obtained from the City Engineer for <br /> temporary use of an existing well for construction water. <br /> Any wells designated ~for abandonment or any wells encountered <br /> during construction, are to be destroyed in accordance with a <br /> permit obkained from Zone 7 by calling (415) 443-9300. <br /> <br />38. That the haul route for all materials to and from this <br /> developmen~ be approved by the City Engineer prior to the <br /> s~art of a~y construction. <br /> <br /> <br />