My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[The improvements are included as projects in the City's Traffic <br /> Development Fee. The project developers and, to the extent so <br /> provided in the development agreement, the City of Pleasanton, <br /> shall pay traffic development fees to address this mitigation.] <br /> Improve Hopyard Road at Stoneridge Drive #11), per MM <br /> TR -1.3. <br /> [The proposed mitigations are a new turn lane and signal retiming. <br /> The improvements are included as projects in the City's Traffic <br /> Development Fee. The Project Developers and, to the extent so <br /> provided in the Development Agreement, the City of Pleasanton <br /> shall pay traffic development fees. The City of Pleasanton shall be <br /> responsible for signal retiming.] (Note that this mitigation is not <br /> needed during the time Stoneridge Drive is striped for one travel <br /> lane in each direction but is needed when Stoneridge Drive is <br /> striped for two travel lanes in each direction.) <br /> Improve Santa Rita Road at Stoneridge Drive #32), per MM <br /> S- TR -2.1 and TR- 1.3(a) <br /> [The proposed mitigation includes restriping and the creation of <br /> new turn lanes. The Project Sponsor will fund this improvement to <br /> the maximum amount provided in the Specific Plan Amendment <br /> ($1.5 million for all off site traffic improvements). Costs in excess <br /> of that amount will come from City funds; either the Stoneridge <br /> Drive Specific Plan fees or the traffic fees generated by the project <br /> to meet these costs.] <br /> Improve Santa Rita Road at Valley Avenue #34), per MM <br /> TR -1.4. <br /> [The proposed mitigation is to construct a second westbound left <br /> turn and either widen a northbound right -turn lane or construct a <br /> third southbound left turn. These improvements are included as <br /> projects in the City's Traffic Development Fee. The project <br /> developers and, to the extent so provided in the development <br /> agreement, the City of Pleasanton shall pay traffic development <br /> fees to address this mitigation. The proposed mitigation is also <br /> signal retiming. The City of Pleasanton shall be responsible for the <br /> signal retiming.] <br /> Draft SEIR, pp. 76 -80; DEIR, pp. 3.9 -35 3.9 -36; FEIR 3- 20,3 -22 <br /> 23. Increased traffic and unacceptable levels of service at two intersections (Fallon <br /> Road at Dublin Boulevard [in Dublin] and Murrieta Blvd. and East Jack London <br /> Blvd. [in Livermore]) not within Pleasanton <br /> 29 <br /> Findings and Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.