My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2010 3:59:05 PM
Creation date
6/10/2010 3:17:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Require project developers to implement construction best <br /> management practices to reduce construction noise, per MM <br /> NO -3.1. <br /> Draft SEIR, pp. 70 -73; DEIR, p. 3.7 -29 <br /> 21. Potential for significant increase in noise levels along Stoneridge Drive <br /> Finding. The preferred project would result in significant noise impacts. The <br /> City finds that the following mitigation measures are feasible and <br /> have been incorporated into the MMRP; however, even with <br /> implementation, the impact would remain significant and <br /> unavoidable. A statement of overriding considerations for this <br /> impact is made in the following section. <br /> Repave Stoneridge Drive between Kamp Drive and Trevor Parkway <br /> with noise attenuating pavement and replace the sound wall <br /> nearest the Stoneridge Drive bridge, per MM S- NO -1.1. Pave new <br /> portions of Stoneridge Drive with noise attenuating pavement per <br /> MM NO -4.1. <br /> The Project Sponsor will be responsible for the funding of the <br /> paving of the new portions of Stoneridge Drive and the construction <br /> of the sound wall. The Project Sponsor will also be responsible for <br /> the funding of repaving of Stoneridge Drive from Kamp Drive to <br /> Trevor Parkway to the maximum amount set forth in the Specific <br /> Plan Amendment ($1.5 million for all off site traffic improvements). <br /> Costs in excess of that amount will come from City funds; either the <br /> Stoneridge Drive Specific Plan fees or the traffic fees generated by <br /> the project to meet these costs. <br /> Draft SEIR, pp. 70 -76 <br /> Transportation and Traffic <br /> Findings Regarding Significant Impacts <br /> 22. Increased traffic and unacceptable levels of service at four Pleasanton <br /> intersections <br /> Finding. The City finds that the following mitigation measures identified for <br /> these four intersections are feasible and have been incorporated <br /> into the MMRP, thereby mitigating the impacts to a less -than- <br /> significant level: <br /> Improve Hopyard Road at Owens Drive #1O), per MM <br /> TR -1.2. <br /> 28 <br /> Findings and Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.