Laserfiche WebLink
grade to canopy will have to be maintained for any new trees planted along Foothill <br />Road. <br />The emphasis of the fire management plan is to control the potential ignition sources of <br />wildland fires; to prevent a "ladder fuel situation" where a fire can "climb" from grassland to <br />low shrubs /scrub to low- hanging tree canopies and then to the home; to maintain existing <br />trees and tree groupings; to allow new trees and tree groupings to buffer /screen the <br />visibility of the new homes on these sites, if necessary. The application of these standards <br />may restrict the scope of the future proposed designs. It is for this reason that staff intends <br />to incorporate the details and standards of the fire management plan with the building and <br />landscape guidelines for a comprehensive integrated document. <br />Item j on Page 15 of this analysis should be revised to read: "Emerging trees must have a <br />minimum 6 -foot spacing cleared from the edge of the canopy The minimum spacing <br />should agree with the figure and, therefore, should be 6 feet, not 12 feet. <br />Residential Fire Sprinkler Systems <br />The proposed homes are required to be equipped with residential fire sprinkler systems. <br />Adequate fire flow is present to serve the homes on these lots. The design of the fire <br />sprinkler systems will be reviewed with the lot- specific design applications and building <br />permit review. There is adequate water supply and pressure available to these sites for <br />fire sprinkler systems without booster pumps or other special equipment. <br />Grading /Urban Stormwater Runoff <br />The existing site grades will be largely retained with the proposed project grading limited to <br />the minimum grading for the driveway entrance, house and driveways, and a reasonably <br />sized private yard area. <br />The proposed building sites will be designed in conformance to the requirements of the <br />National Pollutant Discharge Elimination System (NPDES) of the Clean Water Act: <br />structures and paved areas will be designed to drain to bio- filter areas, swales, or <br />comparable measures to pretreat and then dissipate the stormwater runoff. The project <br />will be required through the grading and building permit and construction processes to <br />incorporate best management practices to control erosion and to prevent discharges into <br />the City's storm drain system resulting from this development. <br />As conditioned the slope bank on the east side of the driveway to Lots 3 and 4 will be <br />replaced with a combination of retaining walls and slope bank to reduce grading. The <br />applicant concurs with this requirement. <br />Geotechnical /Alquist Priolo Earthquake Fault Zone <br />The Alquist Priolo Earthquake Fault Zone for the Calaveras fault traverses the lower <br />portion of Lots 1, 2, and 4. The site was analyzed by the applicants' consultant, Engeo, <br />Inc., with their findings peer- reviewed by Cotton Shires and Associates under supervision <br />by the City Engineer. The Calaveras fault and fault zone was mapped on the Yee property <br />by surveys and trenches completed by the Darwin Meyers firm in 1985. The fault zone <br />with landslide areas is shown on Engeo's geotechnical surveys. <br />Item 6.b., PUD- 87- 19 -03M <br />Page 28 of 37 April 28, 2010 <br />