Laserfiche WebLink
6275 lots. The existing public utilities in Equus Court will remain and placed in <br />public service easements. <br />Deceleration lanes, merge lanes, and a center, two -way left-turn lane will be <br />constructed to serve the Yee /Fuller Smathers properties. <br />The Yee development is only responsible for constructing the re- aligned driveway entrance <br />plus turning lanes /pockets and for moving the access gate. The applicant has executed <br />the ingress /egress and construction easements from Sam Tong, owner of Tract 6275, for <br />the work that would take place on his lots. Cost sharing will be determined preliminarily at <br />the parcel map stage. <br />Bike Lane on Foothill Road <br />Staff recommends the applicant construct a southbound bike lane on Foothill Road from <br />the northerly property line southerly to a point where the channel adjoining the west side of <br />Foothill Road makes it impractical to install the bike lane. The applicants concur with this <br />requirement. <br />The bike lane on the west side of Foothill Road is incomplete. Portions of the bike lane <br />have been constructed with the Lemoine, Moller, Golden Eagle Farms, and Laguna Creek <br />developments. There remain sections of the west side of Foothill Road absent the bike <br />lane because of topography, the proximity of creeks and trees, or because of the low <br />likelihood that the property will be developed in the near future. Installing the bike lane on <br />the entire project frontage will include filling the existing channel adjoining Foothill Road <br />and removing approximately 22 existing trees. Figure 12, below, is a photograph of this <br />section of Foothill Road. <br />Item 6.b., PUD- 87- 19 -03M <br />Figure 12: Section of Foothill Road where creek must be filled for bike lane. <br />Page 20 of 37 <br />April28, 2010 <br />