Laserfiche WebLink
Pursuant to Government Code sections 66020 and 65009, the 90 -day protest period <br />regarding fees and exactions shall commence on the date of the City Council's approval <br />of this project. <br />9. To the extent permitted by law, the project applicant shall defend (with counsel <br />reasonably acceptable to the City), indemnify and hold harmless the City, its City <br />Council, its officers, boards, commissions, employees and agents from and against any <br />claim, action, or proceeding brought by a third party against the indemnified parties and <br />the applicant to attack, set aside, or void the approval of the project or any permit <br />authorized hereby for the project, including (without limitation) reimbursing the City its <br />attorneys fees and costs incurred in defense of the litigation. The City may, in its sole <br />discretion, elect to defend any such action with attorneys of its choice. <br />Biological Mitigation Measures <br />10. The final determination of the jurisdictional status over the intermittent and ephemeral <br />watercourses of the Yee property will be made by the United States Army Corps of <br />Engineers (USACE), the Regional Water Quality Control Board (RWQCB), and the <br />California Department of Fish and Game (CDFG) in conjunction with their permitting <br />processes before submittal of the tentative parcel map. Any impacts to a jurisdictional <br />intermittent and /or ephemeral watercourse will require a 1602 Streambed Alteration <br />permit from the. <br />11. Alameda Whipsnake To protect Alameda Whipsnakes from construction impacts, the <br />applicant shall retain a qualified biologist at least 15 days before the onset of any <br />construction, such as the entrance re- alignment, driveway installation, and building <br />envelopes, to install a silt fence around these construction areas as well as along the <br />entire upslope edge of all grading areas. The fence shall remain in place throughout the <br />project grading and construction phases and may only be removed at the discretion of <br />the biologist. The design and location of the silt fence shall be shown on all construction <br />drawings including improvement plans, grading plans, site plans, and landscape plans to <br />the satisfaction of the Planning Division prior to the issuance of a grading construction <br />permit. Failure to maintain the silt fence shall result in the immediate issuance of a stop <br />work order and cessation of activity. <br />12. Nesting Birds The applicant shall retain a qualified biologist to conduct a pre <br />construction survey at least 15 days before the onset of construction to verify the <br />presence of any endangered and /or threatened CDFG and USFWS bird species <br />including burrowing owls, raptors, and migratory species, if project- construction is <br />scheduled to occur during the nesting season as defined by the CDFG. If nesting birds <br />are found, the applicant shall establish a fenced buffer area around the nest that shall be <br />maintained until the young have fledged. Failure to maintain the fenced buffer area shall <br />result in the immediate issuance of a stop work order and cessation of activity. Outside <br />the breeding season, no pre- construction breeding bird surveys are required. <br />13. San Francisco Dusky- Footed Woodrat The applicant shall retain a qualified biologist to <br />conduct a pre- construction nest survey at least 15 days before the onset of construction <br />to verify the presence of active San Francisco Dusky Footed Woodrat nests. All active <br />woodrat nests that would be directly impacted will be flagged and avoided if feasible. <br />Failure to flag and avoid an active nest shall result in the immediate issuance of a stop <br />work order and cessation of activity. If avoidance is not feasible, the nests shall remain <br />3 <br />