Laserfiche WebLink
51. The applicant shall construct the realigned driveway entrance from Foothill Road to the <br />development to a point defined by the City Engineer where the creek running along the <br />side Foothill Road makes it impractical to widen the road, and the portion of Foothill <br />Road for the deceleration lane to the realigned driveway entrance. These improvements <br />shall be shown on the improvement plans submitted with the parcel map to the <br />satisfaction of the City Engineer. <br />52. The final roadway design of Foothill Road shall be subject to review and approval of the <br />Director of Community Development and should include, to the extent feasible, <br />provisions for both a northbound and southbound bike lane along the entire length of the <br />improved area of Foothill Road that is to the south of the Muirwood Drive South <br />intersection. The southbound bike lane shall be provided in conformance to Condition <br />51. <br />53. The applicant shall provide the typical street section and the driveway sections of Lots 3 <br />and 4 on the parcel map. The sections shall include the street widths, location of the <br />existing sanitary sewer line, and the proposed location of the other utilities, i.e., storm <br />drain line including drainage inlets, water main including fire hydrants, joint trench <br />including street lights and utility boxes. <br />54. If the roadway of the private street is required to be reconstructed, the street shall have <br />subdrains installed at edge of pavement on the uphill side of the street unless otherwise <br />approved by the City Engineer. The subdrains shall be shown on the improvement <br />plans submitted with the parcel map for review and approval. The subdrains shall be <br />connected to the storm drain system or shall be drained by other means determined to <br />be acceptable to the City Engineer <br />55. The applicant shall construct City standard vertical concrete (P.C.C.) curbs and gutters <br />along the project Foothill Road frontage to a point defined by the City Engineer where <br />the creek running along the side Foothill Road makes it impractical to install curb and <br />gutter. The applicant may be required to install additional drainage inlets along west side <br />Foothill Road as determine by the City Engineer. <br />56. The grading for the private driveway on Lots 1 and 2 are reference only these driveways <br />shall not be constructed with the subdivision improvements but shall be constructed by <br />the individual home builder along with the building on -site permit. The parcel map and <br />final grading plans shall contain a note with this condition. <br />Public /Private Utility Installation and /or Modification Water <br />57. The applicant shall connect the water main for the lots of this development to the <br />existing private water main serving the Fuller /Smathers properties. The applicant shall <br />execute an agreement with the owner of the Fuller /Smathers water main consenting to <br />the use of the Fuller /Smathers main and its extension thereof for the residents of this <br />development. The extended water main shall be private and shall be maintained by a <br />Maintenance Association including the Fuller /Smathers lots and the lots within this <br />development. A copy of the fully executed agreement shall be submitted to the <br />satisfaction of the City Engineer and the Planning Division before the parcel map <br />application can be determined complete. A copy of this agreement shall disclosed to the <br />potential property owners prior to the close of escrow of the sale of the lots. <br />15 <br />