Laserfiche WebLink
For trees, the four -lot development plan may impact a total of 67 trees including 34 <br /> Heritage trees due to the construction within the four building envelopes, realigning the <br /> entrance driveway and widening a portion of Foothill Road for a right -turn lane to the <br /> project, extending a water line, and extending the service driveway to Lot 3 and Lot 4. <br /> Potentially affected will be buckeye, oak, and sycamore species varying in diameter from <br /> 6 inches to 27 inches and varying in health from good to poor. If a native /non native tree, <br /> heritage /non heritage size within the building envelope is to be removed for site <br /> development, the following mitigation program shall be followed: <br /> Plant three, 24 -inch box -size trees native specimen trees for each Heritage tree to <br /> be removed and one, 15- gallon -size native tree for each non Heritage tree to be <br /> removed. <br /> Pay to the City's Urban Forestry Fund a sum not to exceed the estimated value of <br /> the tree to be removed provided with the design application(s) for the site. <br /> The replacement trees will be planted in the areas A -1 through A -5 on the <br /> conceptual tree re- planting plan shown on Figure 5, below, to screen the homes <br /> from view and to "fill" the current gaps between existing tree group. The new trees <br /> shall be irrigated by the owners of these lots. <br /> I y( <br /> y��Y� 4 <br /> M ,4� M �:Y <br /> �..i. "y <br /> t at <br /> L..) <br /> r <br /> Figure 5: Conceptual Tree Re- Planting Plan. <br /> Staff believes that the project related impacts are mitigated, with the mitigation measures <br /> incorporated in the project's design or referenced with conditions of approval, and that <br /> there would be no significant or unmitigated environmental impact. Staff, therefore, <br /> believes that the Mitigated Negative Declaration can be issued in conformance with <br /> CEQA standards. If the City Council concurs with this environmental assessment, it must <br /> approve the Mitigated Negative Declaration prior to approving the project. <br /> Page 12 of 16 <br />