My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
060110
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 4:53:06 PM
Creation date
5/26/2010 4:53:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/1/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.6 Traffic Control <br /> The Contractor shall conduct its operations as to cause the least possible obstruction <br /> and inconvenience to public traffic. To the greatest extent possible, all traffic shall be <br /> permitted to pass through the work area. Contractor shall furnish, erect, and maintain <br /> sufficient warning and directional signs, barricades and lights, and furnish sufficient flaggers <br /> to give adequate warning to the public at all times that the road or street is under <br /> construction. <br /> Contractor's vehicles and equipment shall be clearly marked with Contractor's name <br /> or logo and be easily identifiable and be equipped with suitable warning lights and <br /> reflectorized markings for working in daylight and dark. <br /> 1.7 Miscellaneous Provisions <br /> The Contractor shall keep a large stock of common replacement components of a <br /> typical street light and pathway light installation in the City. <br /> The Contractor shall offer alternatives to existing equipment to meet the changing <br /> demand as it occurs, when directed by City. <br /> The Contractor shall refer all questions from the public not covered under this <br /> Agreement to the City's Director of Operations Services. <br /> 2. EMERGENCY WORK <br /> Upon occasion, the Contractor will be called to respond to accident sites, disconnect power, <br /> secure the site for public safety, take down damaged poles or pick up a knock downed light. The <br /> Contractor shall furnish a price for performing this work both during normal working hours and <br /> during weekends, holidays, or other off hours. The response time for emergency calls shall be two <br /> (2) hours, as these often represent dangers to public safety. The Contractor shall also furnish a price <br /> for reinstalling knockdowns with like materials. All costs for labor and equipment to install the <br /> poles and restore the light to proper operation shall be as specified in the Evaluation and Selection <br /> portion of the Request for Proposal which is attached and incorporated by reference as though fully <br /> set forth herein. <br /> The Contractor shall cooperate with the Police Department and the Director of Operations <br /> Services in cases of emergency. <br /> Street Light and Pathway Light Maintenance Contract Contract No. <br /> Attachment 2 Scope of Work Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.