My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
060110
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 4:48:15 PM
Creation date
5/26/2010 4:48:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/1/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2010/2011 CITY OF PLEASANTON FEE SCHEDULE FOR <br /> ENVIRONMENTAL, CONSTRUCTION MANAGEMENT AND <br /> GEOTECHNICAL /MATERIALS TESTING SERVICES <br /> PROFESSIONAL STAFF RATES* <br /> Professional 130 hour <br /> Staff Professional I 155 hour <br /> Staff Professional II Project Manager I 165 hour <br /> Project Professional Project Manager 11 180 hour <br /> Senior Professional Senior Project Manager 205 hour <br /> Principal Principal Professional 230 hour <br /> Program Manager Client Manager 230 hour <br /> Senior Principal Senior Principal Professional 240 hour <br /> Senior Program Senior Client Manager 255 hour <br /> Expert Witness 305 hour <br /> ADMINISTRATIVE /TECHNICAL STAFF RATES <br /> Administrative I 95 hour <br /> Project Administrative 105 hour <br /> Technician 1 (Group 1) 130 hour <br /> Technician II (Group 2) 127 hour <br /> Technician III (Group 3) 110 hour <br /> Technician IV (Group 4) 100 hour <br /> Draftsperson 105 hour <br /> CADD Operator 125 hour <br /> Designer 135 hour <br /> Minimum Charges For Office Time Per Day One Hour at <br /> Applicable Rate <br /> Kleinfelder reserves the right to adjust the fee schedule on projects not completed within 180 days from the <br /> contract signature date. <br /> Public works projects or projects receiving public funds are subject to Prevailing Wage laws. The above <br /> rates apply to projects subject to prevailing wages. <br /> Applies to all professional rates including but not limited to civil, mechanical, chemical, electrical, geotechnical and <br /> environmental engineers; industrial hygienists; geologists; hydrogeologists; hydrologists; and computer specialists. <br /> Group 1 Group 2 <br /> ASNT Level 11 111 AWS -CWI <br /> DSA Masonry ICC Certified Structural Inspector <br /> DSA Shotcrete NICET Level 111 <br /> Lead Inspector Shear Wall /Floor System Inspector <br /> NICET Level IV Building /Construction Inspector <br /> Grou 4 <br /> Group Soils /Asphalt A Field Tech Grade 1 <br /> Earthwork Grading ICC Fireproofing <br /> Excavation Backfill NICET Level 1 <br /> NICET Level 11 Proofload Testing <br /> Torque Testing <br /> 2010 City of Pleasanton Fee Schedule (Revised 3/2010) <br />
The URL can be used to link to this page
Your browser does not support the video tag.