Laserfiche WebLink
ATTACHMENT 1 <br />Fee Schedule <br />These rates are effective from January 1, 2010 <br />through February 28, 2011. Overtime will be charged <br />at 125% of the standard hourly rates however, <br />no overtime will be charged without prior <br />authorization from the client. <br />Personnel Description and Hourly Billing Rates (Reduced) <br />Principal <br />Project Manager <br />Professional Engineer/ Senior Engineer/ CM <br />Associate Engineer/ Senior Designer <br />Assistant Engineer/ Designer <br />Planner <br />Resident Engineer/ Construction Manager <br />Public Works Inspector <br />Clerical <br />Professional Land Surveyor <br />Survey Coordinator <br />Survey Technician <br />Flag Person <br />1 Man Survey Crew <br />2 Man Survey Crew <br />Reimbursable expenses shall include, but are not limited to the following: <br />Mileage <br />Subcontractors <br />Printing <br />Outside Printing Delivery Services <br />In House Printing <br />Other Direct Project Expenses <br />$165 <br />140 <br />140 <br />125 <br />115 <br />120 <br />125 <br />115 <br />54 <br />140 <br />130 <br />104 <br />78 <br />135 <br />190 <br />per current IRS reimbursement rate <br />cost plus 10% <br />cost plus 10% <br />Bond $0.25/sf <br />Mylar 4.75/sf <br />Color Presentation 6 /sf <br />Color Copies 8.5 "x 11" 1.25 /sf <br />11"x 17" 2.4 /sf <br />cost plus 10% <br />Bell Associates, inc e <br />Civil Enn Silo Planning Land <br />