Laserfiche WebLink
DRAFT <br /> disabled access, utilizing universal design, providing additional affordable units in <br /> perpetuity, and evaluating relocating the two buildings in Area C to the southeastern <br /> portion of the site to provide additional open space. <br /> Mr. Byde indicated that the current proposal successfully addresses six of the seven <br /> items. He noted that the revised project includes demolishing the existing leasing office <br /> rather than remodeling it as previously proposed, and replacing it with a significantly <br /> upgraded facility with a 2,100- square -foot recreation facility that includes a gymnasium <br /> and lounge area for residents, as well as a smaller leasing space. He added that there <br /> is a completely new pool area and pool deck which will be ADA accessible and flush <br /> with the existing sidewalk, as well as 36 new, two bedroom apartment units and <br /> additional carports. He noted that the number of parking spaces for the complex, with <br /> the additional units, is currently about 50 spaces over the parking requirement. He <br /> further noted that they had increased the green points up to 100 and are also utilizing <br /> universal design. <br /> Mr. Byde stated that the new units will be built in three areas; they have retooled the <br /> entire plan, kept the northwest Area A the same, located the additional building in <br /> Area B, maintained two -story buildings designed to integrate well into the apartment <br /> architecture, and refocused Area C. He indicated that they could build three -story units <br /> in the center area without making it highly visible, and that they would re -grade and <br /> provide additional units. He then presented the site plan, the landscaping plan, and the <br /> building plans. He indicated that 80 units have interior laundry facilities and that over <br /> time, units would be retrofitted to include interior laundry facilities as they become <br /> available. <br /> Mike Holtman, Holtman Bologna Architects, Walnut Creek, project architect, stated that <br /> they tried to adapt to existing structures that are 25 years old. He noted that they used <br /> hip roofs, stone and glass, stucco, wood siding, and stone treatments, and that the new <br /> clubhouse is significantly enhanced over the existing building. He added that in the <br /> courtyard of Area C, the three stories step down to two stories along the edges of the <br /> parking lot as well as to the courtyard and deck area to the pool. He stated that while <br /> Buildings A and B more closely resemble the portion of the original buildings, they tried <br /> to upgrade them with the architectural elements and tower elements, using earth tone <br /> colors to blend with the neighborhood and the mature landscaping. <br /> Mr. Holtman indicated that the clubhouse, which is directly adjacent to the pool area, will <br /> function with many activities for residents. He added that stone has also been applied <br /> on all four sides of the building, and the project is quite an upgrade from the existing <br /> project. <br /> Chair Olson referred to the two existing freestanding laundry buildings which are being <br /> removed and inquired if any of the existing tenants will be left without laundry facilities <br /> during the construction project. <br /> DRAFT EXCERPTS: PLANNING COMMISSION MINUTES, 3/10/2010 Page 3 of 8 <br />