Laserfiche WebLink
PROJECT DESCRIPTION <br /> In January 2010, Braddock and Logan submitted a revised proposal that addressed the <br /> City Council's direction, as follows: <br /> City Council Direction 36 -Unit Development Plan <br /> Proposed Density Increase project density above the 15- 36 units will be provided, of which five <br /> and Affordability unit threshold of the City's Inclusionary units are subject to the requirements <br /> Zoning Ordinance. Provide the of the City's Inclusionary Zoning <br /> maximum feasible number of low- Ordinance. Five low- income units and <br /> income and moderate income units in 31 moderate income units will be <br /> perpetuity. Consider three -story tall provided in perpetuity (Condition 12). <br /> buildings towards the central area of Twelve units are provided in two -story <br /> the Civic Square site to achieve this buildings and 24 units are provided in <br /> direction. the three -story buildings in the central <br /> area of the development. <br /> Disabled Design the new units to feature Demolish the entire recreation area <br /> Accessibility Universal Design principles. and lower its grade elevation to <br /> eliminate all access ramps to the <br /> parking areas. The new pool area, <br /> leasing office, and gymnasium will be <br /> ADA accessible (Condition 8, 9, and <br /> 16). Four ground floor units will be <br /> ADA accessible with roll -in showers <br /> and the remaining 10 ground floor <br /> units will be ADA adaptable (Condition <br /> 6). All ground floor units will include <br /> Universal Design principals (Condition <br /> 7). <br /> Amenities Consider removing surplus driveways A group entertaining area and a sun <br /> and visitor parking to provide deck with tables and seating and <br /> additional project amenities including lounge chairs are provided within and <br /> play areas, tot lots, bicycle trails, etc. by the pool area. The existing tot lot <br /> and equipment will be retained and <br /> relocated (Condition 17). However, no <br /> additional bicycle trails or play areas <br /> are able to be provided without <br /> compromising internal circulation and <br /> fire access. <br /> Photovoltaic Explore roof mounted photovoltaic The clubhouse /office building will have <br /> Systems systems. integral photovoltaic roof tiles. The <br /> existing solar pool heating system will <br /> be moved to the roof areas of the new <br /> apartment buildings and will feature <br /> updated technology (Condition 3). <br /> Laundry Buildings Ensure that adequate laundry facilities All new units will have washers and <br /> are provided for the entire Civic dryers. Existing units will have <br /> Square development. washers and dryers added to them as <br /> they change occupancy. Three <br /> laundry buildings will be removed with <br /> the proposal and four shall remain. <br /> Over time, the remaining detached <br /> laundry buildings will be removed. <br /> Page 4 of 10 <br />