Laserfiche WebLink
12. That the developer process a minor subdivision application <br /> in order to remove or revise existing parcel property lines. <br /> <br /> 13. That the developer revise the laning on Johnson Drive to <br /> provide for one through lane in each direction and a <br /> left-turn lane into the site. (See attached cross- <br /> section A) <br /> <br />"14. That the developer construct right-turn lanes into the <br /> site at each driveway entrance. (See attached cross- <br /> section B) <br /> <br /> 15. That the developer construct a combined bikeway and pedway <br /> across the entire frontage of the development to the <br /> satisfaction of the City Engineer. This may be combined <br /> with the proposed jogging train. <br /> <br /> 16. That the developer submit a site development plan in <br /> accordance with the Survey Ordinance (Article 3, Chapter 3, <br /> Title II), and that this plan be approved by the City <br /> Engineer prior to the issuance of a building permit. <br /> <br /> 17. That the site development plan include all required <br /> information to design and construct site, grading, paving, <br /> drainage and utilities. Specific items to be indicated <br /> on the site development plan necessary to Construct storm, <br /> sewer and water systems are: <br /> <br /> a. Type of pipes to be used (storm, sewer, water); <br /> b. Length of pieps in linear feet (storm, sewer, water); <br /> c. Slopes of pipes (storm and sewer); <br /> d. Invert elevations at each inlet or junction <br /> structure (storm and sewer); <br /> e. Horizontal control necessary to set relationships <br /> between buildings, parking, curb and gutter and <br /> storm, sewer and water; <br /> f. Show top of pipe and bottom of pipe elevations where <br /> pipes cross under or over one another; . <br /> g. Differentiate between public and private systems. <br /> h. Landscape areas, parking stalls, driveway aisles, <br /> buildings, curbs and gutters shall have horizontal <br /> control dimensioning indicated on site development <br /> plan. <br /> <br /> 18. That the paving sections for the on-site parking and drive <br /> areas be designed on the basis of an R-Value test and a <br /> traffic index to carry the anticipated traffic" loads. This <br /> design shall be subject to the approval of the City Engineer. <br /> The minimum paving section shall be 2" A.C. on 6" of A.B. The <br /> minimum A.C. paYement slope shall be 1%. For pavement sloshes <br /> of less than 1% the surface. runoff shall be carried in a <br /> concrete gutter to an acceptable point of discharge- The <br /> minimum slope for concrete gutter shall be 0.5%. <br /> <br /> <br />