Laserfiche WebLink
TABLE 4- Combination of List A and List B Projects with Ala as he projects <br /> LIST A and B� kritil <br /> Q A -2b lashed Roufe84t- 580 Int r ice' t T fl 2.9'? On 27 <br /> 1 '.1 1 #'4:17 e.. (9= <br /> A-10a Vasco Road Saf Dements Mate 1 c. $4.15 2.59- 3' 24 <br /> B-6 Jadk London Barievad Extersion r $5.23 2.47 3 1.4 <br /> B -10 1-880 Southbound NDV Lane Gap Closure, North Main TM $21.50 1.93 1 28 <br /> 6 B3 I5801Rrst Street lrt- ,e Medication 2.61 1 2 <br /> N Bd 15e0vasco fdlad Sterols Modification 11.36 2.37 1 21 <br /> 0 B5 1-580/Greenville Road Int- Modification ni $8.38 2.34 1 2 <br /> 9 A-3 1-680 ftadli: Lams mert 2) r r t.'.40 1.04 15 i- 27 x <br /> 10 B-8 (safety) Camino Tassajara Widening: East Black awk t $4492 2.25 as 21 <br /> m 8.8 n Camino T:, :'ara Wideri East Bladdn r I. $44.92 2.35 as 1.8 <br /> A-7 .801 sus: R: a s; r $0.60 1.71 1 1.9 <br /> A- 2a South Rae 84 I.580to1.680 4.231 197.00 0.43, 1 28 <br /> m B-1 158011680iterclnn.: vestbotndtosouthbocn. $757.50 001 1 29 <br /> A -9a Crow Canyon wadlmpovements Prase 1 $10.95 0.88 "r 1 1.8 <br /> 16 B-11a 1580 •ressBcs/NOVOn and Off-Ran t l. .00 0:37`. MEM 21 <br /> B-2 Rfth Eastbotid Lan 1-580 R t. V:,-. s $13130 0 as 29 <br /> m A-10b Vasco Road Saf Improvaneris Phase 2 $25.83 0 as 24 <br /> m B-7 8 Charm laud Ekanion r„ $30.15 0.93 0.5 t4 <br /> 20 A -11 EDress Bus/Bus Rapid Trani Phase 7' TBD) tbd 0 1 1.7 <br /> A -9b Cmw on Road Improvements Phase F. 1.1 $32.34 0 as 1.5 <br /> i" <br /> 22 B-11b 1-680 Transit Conidor Improvements I $100.00 0 0.5 1.4 <br /> At this time, Staff is requesting Council provide Pleasanton's MC representative with feedback and <br /> comments regarding the prioritization of List A over List B projects and the creation of State Route 84 as <br /> two separate projects. Staffs recommendation is to maintain the prioritization of List A over List B <br /> projects and to not separate State 84 into separate projects. <br /> Page 4 of 4 <br />