My WebLink
|
Help
|
About
|
Sign Out
ORD 1109
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1101 - 1200
>
ORD 1109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2006 1:36:17 PM
Creation date
3/17/1999 6:32:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C. Condition 20 - Dedicated in-tract streets to <br />City. <br />D. Condition 25 - Submitted CC&R's for City <br />approval. <br />E. Condition 42 - Entered landscape agreement. <br />F. Condition 49 - Obtained encroachment permit <br />prior to construction. <br />G. Condition 51 - Final design of streets have <br /> <br />H. Condition 52 - Design criteria for utilities <br />submitted and approved. <br />I. Condition 57 - CC&R's require Transportation Systems <br />Management Program by companies with <br />100 or more employees. <br />J. Condition 58 - Bus stops and shelters have been <br />approved and installed. <br />K. Condition 62 - Any prior assessment districts were cleared <br />prior to filing parcel map. <br />L. Condition 65 - Erosion and sediment control plans <br />have been approved and constructed. <br />M. Condition 83 - CC&R's provide for maintenance of <br />in-tract streets for 10 years. <br />N. Condition 85 - All wells, septic tanks and other tanks, <br />were properly sealed prior to grading. <br />O. Condition 87 - A dust control plan has been approved. <br />P. Condition 89 - Water system has been approved, meeting <br />immediate and long-range requirements. <br />Q. Condition 93 - Sewer system has been approved, meeting <br />immediate and long-range requirements. <br />R. Condition 95 - Storm drainage system has been approved, <br />meeting flood control and flood hazard <br />program requirements and meeting long-range <br />requirements. <br />S. Condition 98 - Hazard control bond was submitted prior <br />to construction. <br />T. Condition 99 - Landscape and irrigation plans have been <br />approved and installed. <br />U. Condition 106- No occupancy was allowed until the local <br />traffic assessment district was <br />formed and the developer was legally <br />committed to the North Pleasanton Traffic <br />Assessment District. <br /> <br />'~EREAS, in conjunction with a proposed amendment to the <br />Growth Management Element of the General Plan, the <br />Developer has proposed that the City reapprove <br />PUD-8l-30, incorporating the 109 conditions of <br />approval of Ordinance 1040 in its project descriPtion, <br />and the City has prepared, pursuant to CE0A, a <br />supplement to the EIR for PUD-8l-30; and <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.