My WebLink
|
Help
|
About
|
Sign Out
06 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
021610
>
06 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2010 4:13:38 PM
Creation date
2/10/2010 4:13:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/16/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
06 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> FY2008 -09 CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Quarter 4 <br /> Streets Traffic Traffic Grants Dev Assess <br /> CIP GF CIP Gas Tax Measure B Dev Fee Fee- Bernal 558, 561 Contrib Districts Total <br /> 160 550 552,568 535,575 161,166 168 563 499 165, 625,629 <br /> 085012 Annual Sidewalk Maintenance $0 <br /> 085034 Americans with Disabilities Act (ADA) Sidewalk/Ramp Assessment 23,350 $23,350 <br /> 085035 Railroad Quiet Zones Design Only $0 <br /> 085042 Traffic Impact Fee Report Update $0 <br /> 085048 Vineyard Trench Repair $0 <br /> 085054 Traffic Signal at Stoneridge Mall Rd and Embarcadero $0 <br /> 085055 Bi- Annual Neighborhood Traffic Calming Devices $0 <br /> 095003 Annual Resurfacing of Various Streets $0 <br /> 095034 1 -580 (a) Foothill Road Improvements $0 <br /> 805014 Right of Way Transfer to Caltrans (NPID3) $0 <br /> 805017 Traffic Signal Equipment- TR 7381 Ponderosa 4,840 $4,840 <br /> 805019 TriValley Triangle Traffic Study $O <br /> 805024 New BART Station at the Mall $O <br /> 805031 1 -580 HOV Lanes TVTC Project SO <br /> 805033 Pleasanton Traffic Model Update 111,040 $111,040 <br /> 935030 Extension of Livingston Way SO <br /> 935045 Arroyo de la Laguna Imp: Removal of old Bemal Bridge Foundation 2 2 01 $2,201 <br /> 975039 Santa Rita at Valley Intersection Improvements (NPID# 1) $0 <br /> 975062 Owens Drive Improvements Phase 11 (NPID #1) $0 <br /> 985013 Storm Drainage Improvements on Foothill Rd South ofBemal Ave (44.194) ($44,194) <br /> 985016 Dublin Canyon Road Widening $0 <br /> 985o90 Dublin Reimbursement for Future Projects $0 <br /> 995019 Foothill Rd Widening (East Side) Bernal to Foothill PI (Addl Funding) (50,193) ($50,193) <br /> 995066 Dublin Canyon Road Bridge Replacement (Additional Funding) $0 <br /> 995067 Bernal Avenue at Arroyo Del Valle (Construct Second Bridge) $0 <br /> 999999 Interchanges Landscape Maintenance (NP1D3) $0 <br /> 999999 To General Fund Congestion Mgmt (moved from transfers above) $0 <br /> 999999 To General Fund for Administration (moved from transfers above) $0 <br /> STREET PROJECT TOTAL ($37,153) (550,193) $0 $111,040 $0 $0 $0 $0 $23,694 <br /> ENDING STREET FUND BALANCE $138,824 550,193 $0 ($111040) $0 $0 $0 $0 $77,977 <br /> note: numbers in italics signify amendments/transfers already approved by council Page Al0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.