My WebLink
|
Help
|
About
|
Sign Out
06 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
021610
>
06 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2010 4:13:38 PM
Creation date
2/10/2010 4:13:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/16/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
06 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> FY2008 -09 CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Quarter a <br /> Streets Traffic Traffic Grants Dev Assess <br /> CIP k GF CIP Gas Tax Measure B Dev Fee Fee-Bernal 558, 561 Contrib Districts Total <br /> 160 550 552,568 535,575 161,166 168 563 499 165, 625,629 <br /> 005oos Dublin Canyon Road (Eastbound) Widening at Foothill Road S0 <br /> cosh!! Foothill Road Widening at Dublin Canyon Road $0 <br /> 005017 1 -580 Corridor Management/Signals, Phase I $0 <br /> 005024 Hopyard Road and Owens Drive Widening Phase II (NPID 1) $0 <br /> 005030 Del Valle Parkway: Ext from First Str to California Ave (Addl Funding) $0 <br /> 005068 Berna1/1-680 Interchange <br /> 015032 Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad ROW $0 <br /> 015041 Tri- Valley Transportation Development Fee Reserve $0 <br /> ozsm5 Sunol Blvd at 1-680 South Bound Off Ramp: Install New Traffic Signal $0 <br /> 025023 Dougherty Valley Mitigation Revenue Reserve <br /> 035006 Happy Valley Bypass Road <br /> 50 <br /> Hacienda Drive @Owens Drive Reconfigure Intersection and Upgrade <br /> 035020 Traffic Signal $0 <br /> 045018 Bernal- Meadowlark Drive Street Improvements $0 <br /> 055006 Signal Bernal A Fire Station 4 $0 <br /> 055021 Evaluation and Reclassification of Street Surfaces $0 <br /> 055022 Old Stanley Blvd. Improvements: Main Street to First Street $0 <br /> 055026 Second Bridge over Arroyo de la Laguna at Bernal $0 <br /> 065012 Annual Sidewalk Maintenance <br /> 065055 Neighborhood Traffic Calming Devices $0 <br /> 075003 Annual Resurfacing of Various Streets <br /> 075004 Annual Slurry Sealing of Various Streets <br /> 075005 Annual Sidewalk and Intersection Ramp Installations (31,409) ($31,409) <br /> 075007 Annual Traffic Buttons and Line Markers Installation <br /> 075009 Annual Curb and Gutter Replacements for Street Resurfacing Projects $0 <br /> 075012 Annual Sidewalk Maintenance <br /> 075014 Traffic Signal Vineyard Pietronave Lane <br /> 075021 Evaluation and Reclassification of Street Surfaces <br /> 075032 Upgrade Traffic Signal Master Software $0 <br /> Santa Rita Road Francisco Street Traffic Signal Design Potential <br /> 075035 Installation $0 <br /> 075039 Bi- Annual Flashing Beacons In- Pavement Flashers $0 <br /> 081033 Black Ave Utilities (Balance of project is in Water CIP and Sewer CIP) (20.836) ($20,836) <br /> 085003 Annual Resurfacing of Various Streets (175,022) ($175,022) <br /> 085004 Annual Slurry Sealing of Various Streets <br /> 085005 Annual Sidewalk and Intersection Ramp Installations 8,059 58,059 <br /> 085007 Annual Traffic Buttons and Line Markers Installation $0 <br /> 085009 Annual Curb and Guner Replacements for Street Resurfacing Projects 195,858 $195,858 <br /> note: numbers in italics signify amendments/transfers already approved by council Page A9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.