Laserfiche WebLink
BACKGROUND <br /> On March 17, 2009, Council awarded the contract to the lowest responsible bidder, <br /> Wingard Engineering Inc. The project, as described below, has since been completed <br /> and is ready for acceptance. <br /> DISCUSSION <br /> The traffic signal at Stoneridge Mall Road and Embarcadero Court is identified in the <br /> City's General Plan and ranked 4 on the City's traffic Signal Priority List. An existing <br /> agreement between the City and BART required the signal installation prior to <br /> completing the West Dublin BART Station originally scheduled for completion in late <br /> 2009. The project consisted of furnishing and installing all required traffic signal <br /> equipment, traffic signal interconnect equipment, signing and striping, and <br /> miscellaneous concrete work, including modification of the existing curb ramps to <br /> comply with ADA requirements. Construction of the subject project is complete and <br /> ready for acceptance. <br /> In an ongoing effort to reduce the City's carbon footprint and deliver environmentally <br /> responsible projects, the newly installed traffic signal utilizes innovative solutions to <br /> minimize power consumption at the intersection. The proposed solutions also result in <br /> reduced operations and maintenance costs. These solutions include: <br /> Light Emitting Diode (LED) vehicle and pedestrian signal heads; <br /> LED street name signs; <br /> LED intersection safety lighting; <br /> Battery powered wireless in- pavement vehicle detection sensors <br /> Submitted by: Fiscal Review: Approve by: <br /> 1,--1-1)/4 <br /> Brian Dolan David P. Culver Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />