My WebLink
|
Help
|
About
|
Sign Out
PC 2006-66
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2006
>
PC 2006-66
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2009 8:03:05 AM
Creation date
12/4/2009 7:59:48 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/13/2006
DOCUMENT NO
PC 2006-66
DOCUMENT NAME
PDR-529
NOTES
REGENCY CENTERS/HOME DEPOT
NOTES 3
VALLEY AVE/BERNAL AVE/STANLEY BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
street lighting, underground utilities, traffic control devices, landscaping, and <br />automatic irrigation systems. <br />79. The project developer shall submit a final grading and drainage plan prepared by <br />a licensed civil engineer depicting all final grades and on -site drainage control <br />measures, including concrete -lined V- ditches, to protect all cut and fill slopes <br />from surface water overflow. This plan shall be subject to the review and <br />approval of the City Engineer and /or the Director of Building Inspection prior to <br />the issuance of any building permits. <br />80. The project developer shall submit a refundable cash bond for hazard and <br />erosion control prior to issuance of an Engineering and /or Building Department <br />permit. The amount of this bond will be determined by the City Engineer. <br />81. The project developer shall dedicate to the City for street right -of -way purposes <br />those parcels of land intended to be public streets. <br />82. The project developer shall grant an easement to the City over those parcels <br />needed for public service easements (P.S.E.) and which are approved by the <br />City Engineer or other easements, which may be designated by the City <br />Engineer. <br />83. The design for the line, grade, and structural sections for the streets serving this <br />development shall be subject to final review and approval by the City Engineer. <br />84. The project developer shall construct vertical P.C.C. curbs and gutters within this <br />development unless otherwise approved by the City Engineer. When the <br />sidewalk is adjacent to the curb and gutter, they shall be poured monolithically. <br />85. The haul route for all materials to and from this development shall be via the <br />Stanley Business Park, Valley Avenue, Stanley Boulevard, and Bernal Avenue <br />up to Nevada Court and shall be subject to approval by the City Engineer prior to <br />the issuance of an encroachment permit. No construction traffic of any type may <br />use Bernal Avenue south of Nevada Court for any reason. <br />86. The project developer shall submit a dust control plan or procedure as part of the <br />improvement plans. <br />87. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area <br />of a dedicated public street or public service easement approved by the City <br />Engineer shall be privately maintained by the property owners or through an <br />association approved by the City. <br />88. The design of the water supply and sanitary sewer systems shall be subject to <br />the review and approval of the City Engineer. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.