My WebLink
|
Help
|
About
|
Sign Out
ORD 1873
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1873
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:08 PM
Creation date
12/16/2002 9:03:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
12/3/2002
DOCUMENT NO
ORD 1873
DOCUMENT NAME
GREEN BUILDING
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Downtown Specific Plan Area: All privately-owned structures <br />within the boundaries of the Downtown Specific Plan (adopted March 5, 2002) are <br />exempt from the requirements of this chapter. Applicants for new or remodeled <br />structures within this area are encouraged to use their best efforts to incorporate as many <br />of the green building measures as feasible from the LEEDTM Commercial Rating System. <br /> <br /> e. Residential Construction: All buildings or structures that are residential are <br />exempt from the requirements of this Chapter. <br /> <br /> f. Compliance as a Condition of Approval: Compliance with the provisions <br /> <br />of this Chapter shall be listed as a condition of approval on any Design Review or <br />Planned Unit Design Review approval issued for a covered project. Failure to comply <br />with any of the terms of this Chapter shall subject the covered project to the full range of <br />enforcement mechanisms set forth in Section 17.50.100, below. <br /> <br />17.50.050 Submission of Pre-Permitting Documentation. <br /> a. Design Review Documentation: In conjunction with the application for <br /> <br />Design Review or Planned Unit Development Design Review, whichever is applicable, <br />the applicant shall submit documentation indicating the measures to be used to achieve <br />the applicable LEEDTM rating. The documentation, which shall be submitted to the <br />Green Building Compliance Official for review, shall also indicate how many credits the <br />covered project will achieve in each category and the level of LEEDTM certification that <br />will be met. This documentation shall include: <br /> <br /> (1) the Green Building Project Checklist; <br /> <br /> (2) the Green Building Worksheet with an analysis of each credit <br /> <br /> claimed; and, <br /> <br /> (3) any other documentation that may be necessary to show compliance <br />with this Chapter. <br /> <br /> b. Building Permit Documentation: For building permits, the applicant shall <br />submit a completed Green Building Project Checklist with the first building permit plan <br /> <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.