My WebLink
|
Help
|
About
|
Sign Out
ORD 1873
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1873
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:08 PM
Creation date
12/16/2002 9:03:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
12/3/2002
DOCUMENT NO
ORD 1873
DOCUMENT NAME
GREEN BUILDING
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
set submitted. All building plans shall indicate in the general notes or individual detail <br />drawings, where feasible, the green building measures to be used to attain the applicable <br />LEEDTM rating. <br /> <br /> c. Pre-Hearing Meeting: After submission of the documentation required by <br />Section 17.50.050(a), but prior to the hearing on the Design Review or Planned Unit <br />Development Design Review, the Green Building Compliance Official shall arrange a <br />meeting with the applicant to discuss the proposed measures, as needed. <br /> <br />17.50.060 Review of Pre-Permitting Documentation. <br /> a. Approval: Notwithstanding any other provision of this Municipal Code, no <br /> <br />building permit shall be issued for any covered project unless and until the Green <br />Building Compliance Official has approved the pre-permitting documentation submitted <br />for the covered project. The Green Building Compliance Official shall only approve the <br />pre-permitting documentation if it is determined that the pre-permitting documentation <br />indicates that the covered project can achieve the applicable LEEDTM rating, as set forth <br />in Section 17.50.040. If the Green Building Compliance Official determines that these <br />conditions have been met, the pre-permitting documentation shall be marked <br />"Approved," and returned to the applicant. The Green Building Compliance Official <br />shall notify the Building Division that the pre-permitting documentation has been <br />approved. No building permit shall be issued until the pre-permitting documentation has <br />been approved under this section or an exemption has been granted under <br />Section 17.50.080. <br /> <br /> b. Nonapproval: If the Green Building Compliance Official determines that <br />the pre-permitting documentation is incomplete or fails to indicate that the covered <br />project will meet the required LEEDTM rating for the covered project as set forth in <br />Section 17.50.040, he or she shall either: <br /> <br /> (1) Return the pre-permitting documentation to the applicant marked <br />"Denied", including a statement of reasons, and so notify the Building Division; or <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.