My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
102009
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2009 2:46:15 PM
Creation date
10/14/2009 2:46:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/20/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON SCOPE OF SERVICES <br /> UNDERGROUND UTILITY DISTRICT <br /> FOR STANLEY BLVD. RULE 20B <br /> 6.5 City Staff Review Meeting "CONSULTANT" shall meet with City <br /> Engineering Staff to review comments on the 90% plans. <br /> 6.6 -6.8 Signed Plans "CONSULTANT" shall prepare Signed Plans <br /> based on 90% comments from City, Building Department, utility <br /> companies and property owners. <br /> 6.9 Signed Specifications with Boilerplate "CONSULTANT" shall prepare <br /> signed specifications which shall be incorporated by the City into the <br /> boilerplate specifications prepared by the City for all general condition <br /> requirements. <br /> 6.10 Final Estimate "CONSULTANT" shall prepare a detailed cost estimate <br /> for Stamped Plans. <br /> 6.11 Stamped PS &E Submittal "CONSULTANT" shall submit signed plans <br /> and specifications. <br /> 7 Bid Support <br /> 7.1 Bid Questions "CONSULTANT" shall be available to answer technical <br /> questions from bidders during the bid period and recommend and prepare <br /> addenda as necessary. The hours provided for bid support will <br /> correspond to the hours provided in the budget sheet. <br /> 8 Construction Support <br /> 8.1 Submittals "CONSULTANT" shall review material submittals and shop <br /> drawings for compliance with contract documents. The construction <br /> support tasks level of effort will correspond to the hours provided in the <br /> budget. <br /> 8.2 R.F.I.'s- "CONSULTANT" shall respond to Requests for Information during <br /> the construction phase. <br /> BELLECCI ASSOCIATES, INC JULY 10, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.